|
|
| Project Name: Clear Land and Prepare Building Site |
| Project Location: Portland, OR |
| Date: 01/30/2012 |
| Reason for Clearing: Prepare for building |
| Trees/Structures to Remove: Trees |
| Topography: Flat |
| What kind of location is this?: Home/Residence |
| Financing Requested: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: clear for building 1/2 acre in brightwood oregon, also needs access way |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Portland, OR |
| Date: 12/02/2011 |
| Comment: I need an est. on landscaping of a residence, needing excavation only on back side of home. Dan-owner of Empire. 3rd paty. Needing to start next week. |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Portland, OR |
| Date: 11/06/2011 |
| Purpose of Excavation: Other |
| Site surveyed for underground utility lines: Yes |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Request for Commercial Location: No |
| Property Owner: Yes |
| Comment: sanitary sewer needs replacement. It is 175 feet. A long, long dig. <br />Please call me Monday Nov 7th: xxxxxxxxxxxx <br />Aaron Johanson <br />My address is 2303 sw Market St Drive, Portland 97201 |
|
|
|
| Project Name: Install or Replace a Water or Fuel Tank |
| Project Location: Portland, OR |
| Date: 10/12/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: I am looking for estimates and consult for intall of a 100-150 gal propane tank |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds - For Business |
| Project Location: Portland, OR |
| Date: 09/22/2011 |
| What kind of location is this?: Business |
| Comment: I need an estimate on removing dirt from 7.2 acres approx 62000 cubic yards of topsoil that we need excavated in preparation for selling the property. |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds - For Business |
| Project Location: Portland, OR |
| Date: 09/20/2011 |
| What kind of location is this?: Business |
| Comment: I need an estimate on removing dirt from 7.2 acres approx 62000 cubic yards of topsoil that we need excavated in preparation for selling the property. |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Portland, OR |
| Date: 08/11/2011 |
| Purpose of Excavation: Home addition |
| Purpose of Excavation: Home foundation |
| Site surveyed for underground utility lines: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Request for Commercial Location: No |
| Property Owner: Yes |
|
|
|
| Project Name: Clear Land and Prepare Building Site |
| Project Location: Portland, OR |
| Date: 08/04/2011 |
| Reason for Clearing: Other |
| Trees/Structures to Remove: Fences |
| Trees/Structures to Remove: Other |
| Trees/Structures to Remove: Tree Stumps |
| Trees/Structures to Remove: Trees |
| Topography: Flat |
| What kind of location is this?: Home/Residence |
| Financing Requested: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: clear land of all vegetation |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Portland, OR |
| Date: 08/01/2011 |
| Purpose of Excavation: Other |
| Site surveyed for underground utility lines: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Request for Commercial Location: No |
| Property Owner: Yes |
| Comment: I need my back and side yard graded and the over-growth removed so I can convert into a garden/patio. |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Portland, OR |
| Date: 07/25/2011 |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Comment: need an est to have prop excavated for an addition |
|