|
| Project Name: Clear Land and Prepare Building Site |
| Project Location: Pittsburgh, PA |
| Date: 05/21/2012 |
| Reason for Clearing: Prepare for building |
| Trees/Structures to Remove: Tree Stumps |
| Trees/Structures to Remove: Trees |
| Topography: Rolling |
| Topography: Slightly sloped |
| What kind of location is this?: Home/Residence |
| Financing Requested: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: We are building through Heartland Homes; sweat equity |
|
|
|
| Project Name: Install or Replace a Water or Fuel Tank |
| Project Location: Pittsburgh, PA |
| Date: 05/17/2012 |
| Purpose of tank: Petroleum fuel storage |
| Location of tank: Above ground |
| Tank Type: Other |
| What kind of location is this?: Business |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Property Owner: No |
| Comment: We are looking to add golf carts to our golf course (the Bob O'Connor Golf Course) and we need to estimate the cost of installing a fuel tank for the carts. |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Pittsburgh, PA |
| Date: 04/26/2012 |
| Purpose of Excavation: Home foundation |
| Site surveyed for underground utility lines: Don't know |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Ready to Hire |
| Request for Commercial Location: No |
| Property Owner: No |
| Comment: Plan to build a home |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Pittsburgh, PA |
| Date: 04/11/2012 |
| Purpose of Excavation: Driveway |
| Site surveyed for underground utility lines: Yes |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Request for Commercial Location: No |
| Property Owner: Yes |
| Comment: I need to have excativing for a driveway and property leveling. |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Pittsburgh, PA |
| Date: 04/11/2012 |
| Comment: I have a 1/3 acre sloping lot and it needs to have a grade for a driveway and shift some dirt into the backyard. |
|
|
|
| Project Name: Clear Land and Prepare Building Site |
| Project Location: Pittsburgh, PA |
| Date: 04/09/2012 |
| Reason for Clearing: Other |
| What kind of location is this?: Home/Residence |
| Financing Requested: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Excavate so that french drain can be put-in |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Pittsburgh, PA |
| Date: 04/03/2012 |
| Purpose of Excavation: Other |
| Site surveyed for underground utility lines: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Request for Commercial Location: No |
| Property Owner: Yes |
| Comment: regraded yard |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Pittsburgh, PA |
| Date: 03/14/2012 |
| Purpose of Excavation: Home addition |
| Purpose of Excavation: Home foundation |
| Site surveyed for underground utility lines: Don't know |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Request for Commercial Location: No |
| Property Owner: Yes |
| Comment: I wanted to get roundabout quotes for a project that is far into the future so that I know what I need to do it. My current kitchen sits atop a "crawlspace" that isn't really a crawlspace. I suspect that a previous homeowner and his buddies added it while drunk, without permits. I would like to expand my basement to include a room beneath my kitchen and also expand the size of my kitchen and actually put it back together correctly. At the same time it would make sense to go ahead and lower the basement floor in one area so that I can have a very nice finished, livable space down there. As part of the package I will also be expanding the foundation and moving (and replacing) the rear basement entrance to the side of the house and waterproofing the entire foundation with membranes, drains, or whatever makes the most sense. Please email me with any questions you may have. I have estimated the total amount of dirt to move at 75-85 square yards. With the neighbor's permiss |
|
|
|
| Project Name: Clear Land and Prepare Building Site - For Business |
| Project Location: Pittsburgh, PA |
| Date: 03/10/2012 |
| Reason for Clearing: Landscaping |
| Topography: Flat |
| What kind of location is this?: Business |
| Financing Requested: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: I need to excavate an area to put in a patio. Roughly 8-9" deep, and then filled with 6" compact stone. I'll do the pavers myself. |
|
|
|
| Project Name: Clear Land and Prepare Building Site |
| Project Location: Pittsburgh, PA |
| Date: 03/01/2012 |
| What kind of location is this?: Home/Residence |
| Financing Requested: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
|