|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Oklahoma City, OK |
| Date: 05/23/2012 |
| Purpose of Excavation: Other |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Request for Commercial Location: No |
| Comment: Remove remaining soil from storm shelter installation. |
|
|
|
| Project Name: Clear Land and Prepare Building Site |
| Project Location: Oklahoma City, OK |
| Date: 07/02/2011 |
| Reason for Clearing: Prepare for building |
| Trees/Structures to Remove: Trees |
| Topography: Slightly sloped |
| What kind of location is this?: Home/Residence |
| Financing Requested: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Comment: we want selective cut of 7.6 acres to make park like land. |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Oklahoma City, OK |
| Date: 04/12/2011 |
| Purpose of Excavation: Home foundation |
| Site surveyed for underground utility lines: Don't know |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Request for Commercial Location: No |
| Property Owner: Yes |
| Comment: spec homes in Edmond |
|
|
|
| Project Name: Clear Land and Prepare Building Site |
| Project Location: Oklahoma City, OK |
| Date: 11/17/2010 |
| Reason for Clearing: Prepare for building |
| Trees/Structures to Remove: Buildings |
| Trees/Structures to Remove: Tree Stumps |
| Trees/Structures to Remove: Trees |
| Topography: Slightly sloped |
| What kind of location is this?: Home/Residence |
| Financing Requested: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: My brother will build a home on this property when he retires. This property is located in Spencer Oklahoma cedar trees need to be removed from this property and leveling of the grounds. Also a small wooden frame house will need to be demolished. |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Oklahoma City, OK |
| Date: 11/16/2010 |
| Purpose of Excavation: Other |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Request for Commercial Location: No |
| Comment: POND NEEDS CLEANED AND RESHAPED |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Oklahoma City, OK |
| Date: 07/16/2010 |
| Purpose of Excavation: Other |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Request for Commercial Location: Yes |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Oklahoma City, OK |
| Date: 04/30/2010 |
| Purpose of Excavation: Other |
| Consumer Owns Home: Yes |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Request for Commercial Location: No |
| Comment: I need about 10 pick up truckloads worth of dirt (that was dumped there) removed from my property |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Oklahoma City, OK |
| Date: 04/05/2010 |
| Purpose of Excavation: Other |
| Consumer Owns Home: Yes |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Comment: We have an above ground pool that my husband is trying to install at least halfway into the ground. He has much of the land shoveled out, but he needs someone to complete the bottom of the pool (the rest of the shoveling out of the soil) so that he can re-line and have the above ground pool about half-way into the ground. We want this done in May, and finished by the end of May. So all the person has to do is finish the shoveling and make it level. |
|
|
|
| Project Name: Install or Replace a Water or Fuel Tank |
| Project Location: Oklahoma City, OK |
| Date: 03/11/2010 |
| Consumer Owns Home: Yes |
| Purpose of tank: Petroleum fuel storage |
| Tank Type: Steel |
| Request is for Commercial Location: Yes |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Ready to Hire |
| Comment: Commercial location,fuel piping. |
|
|
|
| Project Name: Clear Land and Prepare Building Site |
| Project Location: Oklahoma City, OK |
| Date: 01/25/2010 |
| Consumer Owns Home: Yes |
| Reason for Clearing: Other |
| Trees/Structures to Remove: Trees |
| Topography: Slightly sloped |
| Request is for Commercial Location: No |
| Financing Requested: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Comment: clearing land for agricultural land use |
|