| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Louisville, KY |
| Date: 01/30/2012 |
| Purpose of Excavation: Other |
| Site surveyed for underground utility lines: Yes |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Request for Commercial Location: No |
| Property Owner: Yes |
| Comment: Fix erosion on a dam |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Louisville, KY |
| Date: 01/14/2012 |
| Purpose of Excavation: Home foundation |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Request for Commercial Location: No |
| Comment: New Home Construction, Tree filled lot needs to be cleared, lot is sloped in 2 directions needs to be pregraded and foundation hole needs to be dug. |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Louisville, KY |
| Date: 10/22/2011 |
| Purpose of Excavation: Home foundation |
| Site surveyed for underground utility lines: Yes |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Request for Commercial Location: No |
| Property Owner: Yes |
| Comment: sidewalk/patio reconstruction and general regrading. retaining wall. |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Louisville, KY |
| Date: 09/26/2011 |
| Purpose of Excavation: Other |
| Site surveyed for underground utility lines: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Request for Commercial Location: No |
| Property Owner: Yes |
| Comment: Had a new sewer line put in Oct. 2010, waited for the ground to settle. We started to till our yard (already killed the grass) but found it to be a bigger job then what we expected. We moved approx. 15 wheelbarrel of dirt from one side of the yard (which we sodded) to the area with killed yard. We would like someone to come in, loosed the soil, grade the yard and seed the yard. |
|
|
|
| Project Name: Clear Land and Prepare Building Site |
| Project Location: Louisville, KY |
| Date: 07/14/2011 |
| Reason for Clearing: Prepare for building |
| Trees/Structures to Remove: Buildings |
| Trees/Structures to Remove: Tree Stumps |
| Topography: Slightly sloped |
| What kind of location is this?: Home/Residence |
| Financing Requested: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: tear down existing garage, prep land for new garage- possible landscape removal |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Louisville, KY |
| Date: 06/14/2011 |
| Purpose of Excavation: Other |
| Site surveyed for underground utility lines: Don't know |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Request for Commercial Location: No |
| Property Owner: Yes |
| Comment: I need a quote for excavate the back yord to install a pool |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Louisville, KY |
| Date: 05/31/2011 |
| Purpose of Excavation: Home addition |
| Site surveyed for underground utility lines: Yes |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Request for Commercial Location: No |
| Property Owner: Yes |
| Comment: The foundation with footers has be excavated and poured - apprx 35 linear foot for room addition. |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Louisville, KY |
| Date: 04/19/2011 |
| Purpose of Excavation: Driveway |
| Site surveyed for underground utility lines: Yes |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Request for Commercial Location: No |
| Property Owner: Yes |
| Comment: Escavating approximately 22' x 60' x 4" beside an existing driveway to gravel and expand parking. Dug dirt will be dumped on low spots in main yard on other side of drive to level. Please submit bid by email. |
|
|
|
| Project Name: Clear Land and Prepare Building Site |
| Project Location: Louisville, KY |
| Date: 02/21/2011 |
| Reason for Clearing: Other |
| Topography: Slightly sloped |
| What kind of location is this?: Home/Residence |
| Financing Requested: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: evened out for in ground pool |
|
|
|
| Project Name: Install or Replace a Water or Fuel Tank |
| Project Location: Louisville, KY |
| Date: 01/26/2011 |
| Comment: need to get an estimate on installing a gas tank for above the ground - for a commercial business. MV Transportation, Inc |
|