|
|
| Project Name: Install or Replace a Water or Fuel Tank |
| Project Location: Burlington, MA |
| Date: 10/20/2011 |
| Purpose of tank: Petroleum fuel storage |
| Location of tank: Above ground |
| Tank Type: Other |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Remove existing 275 gallon oil tank (in basement) and replace with new tank. |
|
|
|
| Project Name: Clear Land and Prepare Building Site |
| Project Location: Burlington, MA |
| Date: 08/17/2011 |
| Reason for Clearing: Prepare for building |
| What kind of location is this?: Home/Residence |
| Financing Requested: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Getting ready to do an addition need a price on the excavating for the new foundation. I already have the architectual drawings and plot plan. |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Burlington, MA |
| Date: 05/17/2011 |
| Comment: I need boulders moved at a dead end street and put back. Need access to forested area. Have permission from the city. Need small backhoe, but not sure as to size of boulders. (Called before sending this lead) This is National Ecological Environmental service, doing a balloon test in prep for a tower. |
|
|
|
| Project Name: Clear Land and Prepare Building Site |
| Project Location: Burlington, MA |
| Date: 05/12/2011 |
| Reason for Clearing: Landscaping |
| Trees/Structures to Remove: Tree Stumps |
| Trees/Structures to Remove: Trees |
| Topography: Slightly sloped |
| What kind of location is this?: Home/Residence |
| Financing Requested: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Looking to clear my lot of about 30-40 tall pines. Some other brush needs to be cleared as well |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Burlington, MA |
| Date: 04/25/2011 |
| Purpose of Excavation: Other |
| Site surveyed for underground utility lines: Yes |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Request for Commercial Location: No |
| Property Owner: Yes |
| Comment: remove roughly 35 stumps and old fill, bring in new dirt, grade smooth. |
|
|
|
| Project Name: Install or Replace a Water or Fuel Tank |
| Project Location: Burlington, MA |
| Date: 11/03/2010 |
| Purpose of tank: Petroleum fuel storage |
| Location of tank: Above ground |
| Tank Type: Steel |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: No |
| Comment: Need to replace a 275 gal home heating fuel tank, at my mothers house. |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Burlington, MA |
| Date: 07/30/2010 |
| Comment: I need to get estimate for excavating a pool with a lot of ledge. |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Burlington, MA |
| Date: 05/15/2010 |
| Purpose of Excavation: Other |
| Site surveyed for underground utility lines: Yes |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Request for Commercial Location: No |
| Property Owner: Yes |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Burlington, MA |
| Date: 05/02/2010 |
| Purpose of Excavation: Home foundation |
| Site surveyed for underground utility lines: No |
| Consumer Owns Home: Yes |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Request for Commercial Location: No |
| Comment: Need to reroute existing sump pump outflow to storm sewer tie in or possible dry well. Also wouldlike to discuss installation of exterior perimeter drain possibly |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Burlington, MA |
| Date: 04/12/2010 |
| Purpose of Excavation: Other |
| Site surveyed for underground utility lines: Don't know |
| Consumer Owns Home: Yes |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Request for Commercial Location: No |
| Comment: We need to get the ground ready for a play structure that is going up on Friday. Need to have this completed by Thursday. Would need to get fill in plus level off the area appropriately for the safety of the play structure |
|