| Project Name: Clear Land and Prepare Building Site |
| Project Location: Arlington, VA |
| Date: 05/22/2012 |
| Reason for Clearing: Prepare for building |
| Trees/Structures to Remove: Buildings |
| Trees/Structures to Remove: Trees |
| Topography: Flat |
| What kind of location is this?: Home/Residence |
| Financing Requested: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: We have two lots in Arlington next to each other that are in the process of being subdivided. It has an existing house and several trees that need to be demolished. We're also looking for excavation and concrete (foundation) work. Thanks! xxxxx |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Arlington, VA |
| Date: 04/24/2012 |
| Purpose of Excavation: Other |
| Site surveyed for underground utility lines: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Request for Commercial Location: No |
| Property Owner: Yes |
| Comment: I need a 12x24 area dug out to a 5 inch depth. It will be a for a patio installation that I will do myself. The job must be completed by Friday April 27th, so please only respond if the job can be done by that date. |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Arlington, VA |
| Date: 04/09/2012 |
| Purpose of Excavation: Other |
| Site surveyed for underground utility lines: Don't know |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Request for Commercial Location: No |
| Property Owner: Yes |
| Comment: I would like to help my son level a portion of his sloped yard to give my grand children a little more flatness to play. I think this will require about 10 yards of soil that would need to be moved into a back yard with a bobcat or some light vehicle possible over some planks to reduce the damage to the side yard He lives on the end of a street where soil could be dumped and then transported to the back .Please respond if this something that we could contract when I am in the area this Saturday. Thank You Michael L Baird xxxxxxxxxxxxxxxxxxx |
|
|
|
| Project Name: Remove a Water or Fuel Tank |
| Project Location: Arlington, VA |
| Date: 03/14/2012 |
| Kind of Tank: Above ground |
| Kind of Tank: Steel |
| Material Stored in Tank: Heating oil |
| How Long Since Tank Was Used: Don't Know |
| Leakage Details: Yes, loss of vegetation in area over tank |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
|
|
|
| Project Name: Install or Replace a Water or Fuel Tank |
| Project Location: Arlington, VA |
| Date: 01/03/2012 |
| Purpose of tank: Drinking water storage |
| Purpose of tank: Waste water storage |
| Location of tank: Above ground |
| Tank Type: Fiberglass |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: food truck/vender |
|
|
|
| Project Name: Remove a Water or Fuel Tank |
| Project Location: Arlington, VA |
| Date: 11/14/2011 |
| Kind of Tank: Above ground |
| Material Stored in Tank: Heating oil |
| How Long Since Tank Was Used: In use now, needs removing |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Comment: Remove an above grade fuel oil tank and remnants of last season heating oil. |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Arlington, VA |
| Date: 11/07/2011 |
| Purpose of Excavation: Driveway |
| Site surveyed for underground utility lines: Don't know |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Request for Commercial Location: No |
| Property Owner: Yes |
| Comment: I have a 12ft x 12ft by 4ft deep area that needs to be excavated. The area is accessed from the alley behind my house. |
|
|
|
| Project Name: Clear Land and Prepare Building Site |
| Project Location: Arlington, VA |
| Date: 07/28/2011 |
| What kind of location is this?: Home/Residence |
| Financing Requested: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Comment: I need some fill dirt removed. |
|
|
|
| Project Name: Clear Land and Prepare Building Site |
| Project Location: Arlington, VA |
| Date: 07/24/2011 |
| Reason for Clearing: Prepare for building |
| Trees/Structures to Remove: Tree Stumps |
| Trees/Structures to Remove: Trees |
| Topography: Flat |
| What kind of location is this?: Home/Residence |
| Financing Requested: Yes |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Comment: Need to partially clear a 1.6 acre lot to prepare for building a residential property. Plan on clearing about 1 acre of lot. Land is completly wooded and flat. Land is accessable by road, and close to major metropolitan area. (DC/NOVA suburb) |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Arlington, VA |
| Date: 06/16/2011 |
| Purpose of Excavation: Home foundation |
| Site surveyed for underground utility lines: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Request for Commercial Location: No |
| Property Owner: Yes |
| Comment: need to excavate (most likely by hand) down to the footer around my attached garage, install and daylight exterior drain pipe, patch and waterproof subterranean wall and backfill |
|