|
|
| Project Name: Install or Replace a Water or Fuel Tank |
| Project Location: Arlington, MA |
| Date: 11/04/2011 |
| Purpose of tank: Petroleum fuel storage |
| Location of tank: Above ground |
| Tank Type: Fiberglass |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Have a 275 gallon home fuel tank that is nearing the end of life, and would like to get an estimate on removing the old one and replacing with a new one |
|
|
|
| Project Name: Remove a Water or Fuel Tank |
| Project Location: Arlington, MA |
| Date: 08/08/2011 |
| Comment: estimate for removal of above ground oil tank for heating oil |
|
|
|
| Project Name: Remove a Water or Fuel Tank |
| Project Location: Arlington, MA |
| Date: 04/22/2011 |
| Kind of Tank: Above ground |
| Material Stored in Tank: Heating oil |
| How Long Since Tank Was Used: In use now, needs removing |
| Leakage Details: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: We are converting our house from oil to gas and need to have the oil tank removed from the basement. |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Arlington, MA |
| Date: 04/13/2011 |
| Purpose of Excavation: Driveway |
| Site surveyed for underground utility lines: Don't know |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Request for Commercial Location: No |
| Property Owner: Yes |
| Comment: A fieldstone masonry retaining wall at the rear of the driveway is cracked, bulging and has failed. It needs be rebuilt, and we would like to widen the parking area in the process. The driveway is currently 13 feet wide and it is 19 feet from the sidewalk to the retaining wall, which is about five feet high. We would like to widen the space without modifying the curb cut, giving a driveway entrance closer to 15 feet wide expanding to 20-30 feet wide at the rear. |
|
|
|
| Project Name: Remove a Water or Fuel Tank |
| Project Location: Arlington, MA |
| Date: 01/31/2011 |
| Kind of Tank: Above ground |
| Material Stored in Tank: Heating oil |
| How Long Since Tank Was Used: In use now, needs replacing |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Comment: oil tank removal |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Arlington, MA |
| Date: 01/13/2011 |
| Purpose of Excavation: Home addition |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Request for Commercial Location: No |
| Property Owner: Yes |
| Comment: Addition Excavation and backfilling |
|
|
|
| Project Name: Clear Land and Prepare Building Site |
| Project Location: Arlington, MA |
| Date: 01/12/2011 |
| Reason for Clearing: Other |
| Trees/Structures to Remove: Other |
| Topography: Other |
| What kind of location is this?: Home/Residence |
| Financing Requested: No |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: clearing of dirt in crawl space basement, clearing of land to build foundation for garage. |
|
|
|
| Project Name: Remove a Water or Fuel Tank |
| Project Location: Arlington, MA |
| Date: 09/28/2010 |
| Kind of Tank: Above ground |
| Material Stored in Tank: Heating oil |
| How Long Since Tank Was Used: Don't Know |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Comment: heating oil tank needs to be removed |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds - For Business |
| Project Location: Arlington, MA |
| Date: 01/29/2010 |
| What kind of location is this?: Business |
| Comment: excavation for a parking lot. - estimate, testing for groundwater work, municipal location. |
|