

|
 |
Prescreened Electricians - Tampa, FL (Florida)

Unscreened Electrical Contractors - Tampa, FL
Related Projects for Electrical in Tampa, FL
Narrow your search by choosing one of these specific Electrical services.
|
|
Not Looking for Electricians in Tampa, FL?
If you're looking for Electricians that serve a different city in Florida, here are some popular suggestions:

Find additional Florida Electricians
|
|
Recent Job Requests for Electricians in Tampa, Florida
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures - For Business |
| Project Location: Tampa, FL |
| Date: 05/24/2012 |
| Services Needed: Install new switches, fixtures or outlets |
| What kind of location is this?: Business |
| Is this an emergency?: Yes |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Electrical fixtures : Outlets |
| Comment: 220 and 110 outlets for an inserting machine for mailing business |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Tampa, FL |
| Date: 05/19/2012 |
| What kind of location is this?: Home/Residence |
| Is this an emergency?: No |
| After Business Hours: No |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Electrical fixtures : Outlets |
| Electrical fixtures : Switches |
| Electrical fixtures : Ceiling fan or chandelier |
| Electrical fixtures : Interior lights |
| Comment: Add dimmers and high hats... and more |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures - For Business |
| Project Location: Tampa, FL |
| Date: 05/18/2012 |
| What kind of location is this?: Business |
| Is this an emergency?: No |
| Comment: PROBLEM REPORTED: NEED PROPOSAL TO PERFORM THE FOLLOWING SCOPE OF WORK: 1) Work to be performed after store operational hours - to be completed within a 5 day window, including one overnight only. 2) Schedule with the Store Manager and advise Express immediately 3) Please take "BEFORE" Pictures 4) Remove existing center runway floor fixtures and dispose of. Typically 9-18 units. These are the low bins in the 1st PDF photo. Store staff will be responsible to de-merchandise these units. 5) Disconnect from power and remove Target Wall (1) and Target Wall benches (2). This unit is shown in the 1st PDF photo. It is the fixture with the Famous Footwear lettering and benches against the back wall. **Cap existing power in j-box above ceiling. 6) Disconnect and remove 4-12 pendant lights over the runway floor fixtures (red lights seen in the 1st PDF). **Cap power in the associated j-box above the ceiling. Replace ceiling tile with matching tile. Pull tile from st |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Tampa, FL |
| Date: 05/18/2012 |
| Floorplan: I am considering changes to kitchen floorplan |
| Cabinets: No - I do not plan to move or update the cabinets |
| Appliances: No - I do not plan to move or update the appliances |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Lighting: Yes - I plan to update the lighting |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: No |
| Comment: will be moving out because short sell |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Tampa, FL |
| Date: 05/17/2012 |
| Services Needed: Troubleshoot an electrical problem |
| Services Needed: Repair or replace an old switch, fixture or outlet |
| What kind of location is this?: Home/Residence |
| Is this an emergency?: No |
| After Business Hours: No |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Electrical fixtures : Outlets |
| Electrical fixtures : Exterior lights |
| Electrical fixtures : Other fixtures |
| Comment: In order to begin fixing up home, electrical problems need to be fixed first. Back bathroom outlet isn't working, exterior outlet not working, middle of yard fixture not working, exterior light stays on when breaker is switched on, shed lighting not working. Focus on interior outlets, but would like input on whether exterior problems need work now or are related to interior problems. |
|
|
|
| Project Name: Upgrade an Electrical Panel or Wiring |
| Project Location: Tampa, FL |
| Date: 05/17/2012 |
| What kind of location is this?: Business |
| Historical Work: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Project description: Electrical panel upgrade only |
| Property Owner: Yes |
| Comment: Need to replace old 100a box and breakers due to rust commercial building |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures - For Business |
| Project Location: Tampa, FL |
| Date: 05/15/2012 |
| What kind of location is this?: Business |
| Is this an emergency?: No |
| After Business Hours: No |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Electrical fixtures : Interior lights |
|
|
|
| Project Name: Upgrade an Electrical Panel or Wiring |
| Project Location: Tampa, FL |
| Date: 05/14/2012 |
| Comment: I need an estimate to have my home rewired from old knobb and tube wiring |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures - For Business |
| Project Location: Tampa, FL |
| Date: 05/14/2012 |
| Services Needed: Install new switches, fixtures or outlets |
| What kind of location is this?: Business |
| Is this an emergency?: No |
| After Business Hours: No |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Electrical fixtures : Other fixtures |
| Comment: We need to install 3 new "Exit" lights in our building. |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Tampa, FL |
| Date: 05/14/2012 |
| What kind of location is this?: Home/Residence |
| Is this an emergency?: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: just moved into home and having electrical issue/ some outlets don't work some outlets are add and not sincronized |
|
|
ServiceMagic Pros Are...

|