|
|
| Project Name: Install a Generator |
| Project Location: Southbury, CT |
| Date: 01/30/2012 |
| Describe Generator Use: Emergency back-up power |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: already had electrian in our home, but lost his card. he was through your service can you help me. ? |
|
|
|
| Project Name: Repair a Generator |
| Project Location: Southbury, CT |
| Date: 01/25/2012 |
| Type of Generator: Portable |
| Type of Generator Repair: Not enough power |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: no electrical power |
|
|
|
| Project Name: Install a Generator |
| Project Location: Southbury, CT |
| Date: 01/14/2012 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Entire house |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Would like to procure and install 10kW standby generator that is fueled by LP despire that don't have LP service at the moment. Unit should be hooked to main panel with auto start. |
|
|
|
| Project Name: Install a Generator |
| Project Location: Southbury, CT |
| Date: 01/12/2012 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Entire house |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: back up power |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Southbury, CT |
| Date: 12/15/2011 |
| Services Needed: Install new switches, fixtures or outlets |
| What kind of location is this?: Home/Residence |
| After Business Hours: No |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Electrical fixtures : Other fixtures |
| Comment: <br />Would like to install a chandelier lift in an existing open foyer |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Southbury, CT |
| Date: 12/14/2011 |
| Services Needed: Install new switches, fixtures or outlets |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Electrical fixtures : Outlets |
| Comment: need a 220 V outlet for Electric Hot Water Heater near Oil Burner about 35 feet from Main Breaker in Garage . Thank You John Ciccarino |
|
|
|
| Project Name: Upgrade an Electrical Panel or Wiring |
| Project Location: Southbury, CT |
| Date: 12/10/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Project description: Electrical panel upgrade only |
| Comment: looking for a est on a panel install for generator |
|
|
|
| Project Name: Install a Generator |
| Project Location: Southbury, CT |
| Date: 12/04/2011 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Refrigerator |
| Devices to be Run by Generator: Regular house lighting |
| Devices to be Run by Generator: Specific outlets |
| Devices to be Run by Generator: Water heater |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: require a 14k propane fed back-up generator. My home is all electric, no fireplace or chimney, and operates 3 separate heat pumps/ air handlers (not to be run on generator). so i require some additional source to keep pipes from freezing ( will start with remote heaters, plug-in type) <br /><br /> <br /> |
|
|
|
| Project Name: Install a Generator |
| Project Location: Southbury, CT |
| Date: 11/18/2011 |
| Describe Generator Use: Other |
| Devices to be Run by Generator: Entire house |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: INSTALL SLAB, INSTALL PROPANE TANK, & TRENCH PIPING TO GENERATOR LOCATION. INSTALL GENERATOR,TRANSFER PANEL, AND WIRE TO AUTOMATIC. |
|
|
|
| Project Name: Install a Generator |
| Project Location: Southbury, CT |
| Date: 11/17/2011 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Entire house |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Looking for Generator interlock and power inlet box installation for 8000 watt generator - Siemens panel. |
|