| Project Name: Upgrade an Electrical Panel or Wiring |
| Project Location: Pinckney, MI |
| Date: 01/24/2012 |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Project description: Electrical panel upgrade only |
| Property Owner: Yes |
| Comment: Would like to replace 200 Amp Pushmatic panel with modern panel with additional circuit space or sub panel attached. Would also like generator plug-in feature. |
|
|
|
| Project Name: Install a Generator |
| Project Location: Pinckney, MI |
| Date: 01/14/2012 |
| Devices to be Run by Generator: Emergency lighting |
| Devices to be Run by Generator: Entire house |
| Devices to be Run by Generator: Heating and A/C |
| Devices to be Run by Generator: Refrigerator |
| Devices to be Run by Generator: Regular house lighting |
| Devices to be Run by Generator: Water heater |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: install existing generator |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Pinckney, MI |
| Date: 01/11/2012 |
| Services Needed: Install new switches, fixtures or outlets |
| Services Needed: Move switches, fixtures or outlets |
| What kind of location is this?: Home/Residence |
| After Business Hours: No |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Electrical fixtures : Outlets |
| Electrical fixtures : Bath or attic exhaust fan |
| Electrical fixtures : Other fixtures |
| Comment: I need an estimate for the following: 3 additional electrical outlets, 2 phone jacks, 2 cable outlets, 2 lights installed over bathroom vanities, bathroom ceiling light/fan separated and transformed to a ceiling fan plus light can. Plus and estimate to install a large a gas ignited generator. |
|
|
|
| Project Name: Install a Generator |
| Project Location: Pinckney, MI |
| Date: 01/09/2012 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Comment: Need generator hooked up to my garage box. Need 220 installed and 75' of SO wire. |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Pinckney, MI |
| Date: 12/02/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: I need an estimate for repairing electric in our house. Electricity goes off/on ramdonly. |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Pinckney, MI |
| Date: 11/27/2011 |
| Electrical Devices: Ceiling fixtures/fans |
| Electrical Devices: Switches (standard) |
| Electrical Devices: Wall outlets |
| Rooms Included: Bedroom(s) |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Project description: Update or add a few fixtures, outlets or switches |
| Property Owner: Yes |
| Comment: Converting a large office into 2 smaller bedrooms (actually un-doing the previous owners renovation) Need outlets added to the new wall and move existing switches. Also want to add ceiling fixture to center of each room. |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Pinckney, MI |
| Date: 11/16/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Comment: estimate for installing 3 outlets in basement. 2 in the wall and 1 in ceiling |
|
|
|
| Project Name: Install a Generator |
| Project Location: Pinckney, MI |
| Date: 11/10/2011 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Entire house |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: add a whole house generator |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Pinckney, MI |
| Date: 08/19/2011 |
| What kind of location is this?: Home/Residence |
| After Business Hours: No |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: power is gone in half the house after ? overloaded circuit??? |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Pinckney, MI |
| Date: 07/20/2011 |
| What kind of location is this?: Home/Residence |
| After Business Hours: No |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: i need to have an independent line setup for my well. |
|