|
|
| Project Name: Install a Generator |
| Project Location: Milton, VT |
| Date: 01/17/2012 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Entire house |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Comment: I want a turn key system (Generator) that will keep the power on in my home. I want it to go on automatically when power is off and go to standby when street power is restored. |
|
|
|
| Project Name: Install a Generator |
| Project Location: Milton, VT |
| Date: 12/16/2011 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Entire house |
| Devices to be Run by Generator: Heating and A/C |
| Devices to be Run by Generator: Refrigerator |
| Devices to be Run by Generator: Regular house lighting |
| Devices to be Run by Generator: Water heater |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Comment: I want a generator to keep power going in my house with all the appliances etc. I want it to be automatic turn on once we loose power and also the ability to flip back to standby once the power is restored. |
|
|
|
| Project Name: Install a Generator |
| Project Location: Milton, VT |
| Date: 11/02/2011 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Entire house |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: I have the generator and looking for best available option to install with gentran transfer switch or other |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Milton, VT |
| Date: 10/13/2011 |
| Services Needed: Install new switches, fixtures or outlets |
| What kind of location is this?: Home/Residence |
| After Business Hours: No |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Electrical fixtures : Outlets |
| Comment: run a220 line for a stove |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Milton, VT |
| Date: 06/14/2011 |
| Services Needed: Repair or replace an old switch, fixture or outlet |
| What kind of location is this?: Home/Residence |
| After Business Hours: No |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: 1) Our electrical outlet in the basement is not working. <br />2) our oven isn't working and it appears to be an electrical issue. |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Milton, VT |
| Date: 06/08/2011 |
| Services Needed: Repair or replace an old switch, fixture or outlet |
| Services Needed: Install new switches, fixtures or outlets |
| What kind of location is this?: Home/Residence |
| After Business Hours: No |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Electrical fixtures : Other fixtures |
| Comment: I have a 3 prong timer that I want to use for my in ground outdoor pool. I need to have a 120V installed. |
|
|
|
| Project Name: Install a Generator |
| Project Location: Milton, VT |
| Date: 10/15/2010 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Emergency lighting |
| Devices to be Run by Generator: Entire house |
| Devices to be Run by Generator: Refrigerator |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Comment: install a gentran sys=stem so i can hook up to generator as needed |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Milton, VT |
| Date: 10/07/2010 |
| Comment: I need tohave hardwired smoke detectors installed in my home - this is going to probably to be 3. |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Milton, VT |
| Date: 06/08/2010 |
| Services Needed: Repair or replace an old switch, fixture or outlet |
| What kind of location is this?: Home/Residence |
| After Business Hours: No |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Consumer Need: Quotes: Looking for quotes on this project |
| Comment: Remove existing 100 Amp fuse panel and replace with 200 Amp X 40 <br />Must have following min: <br />Separate ground and neutral buzz bars. <br />50 amp range 220 <br />50 amp Dryer 220 <br />50 Amp welder 220 <br />New pool connection Amps not known yet. <br />Future hot tub 220 <br />12 20 Amp <br />2 30 Amp <br />1 15 Amp <br /> |
|