|
| Project Name: Upgrade an Electrical Panel or Wiring |
| Project Location: Milford, NH |
| Date: 02/06/2012 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Project description: Electrical panel upgrade only |
| Comment: need estiamte on electrical wiring |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures - For Business |
| Project Location: Milford, NH |
| Date: 01/31/2012 |
| Services Needed: Install new switches, fixtures or outlets |
| What kind of location is this?: Business |
| Timing: Within 1 Week |
| Type of Business: Retail/Restaurant |
| For how many locations/units is this request?: 1 |
| On-going: Yes |
| Electrical fixtures : Outlets |
| Comment: National company needs electrician for outlet project at retail location. (There is 1 outlet needed in the office. That outlet should be on the same dedicated breaker as the POS system. There is a UPS that plugs into that outlet with 4 controllers plugged into that.) |
|
|
|
| Project Name: Install a Generator |
| Project Location: Milford, NH |
| Date: 12/05/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: I recently purchase a genrac generator for my home. I need someone who knows the required ground measurements & location pre prep for the delivery and installment of the generator due on the Dec.19th. 2011. Mine is for a Propane connection which there is a line in the back of the house that can be used for the gas. <br /> |
|
|
|
| Project Name: Install a Generator |
| Project Location: Milford, NH |
| Date: 12/02/2011 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Heating and A/C |
| Devices to be Run by Generator: Refrigerator |
| Devices to be Run by Generator: Regular house lighting |
| Devices to be Run by Generator: Water heater |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: <br /> |
|
|
|
| Project Name: Install a Generator |
| Project Location: Milford, NH |
| Date: 12/02/2011 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Heating and A/C |
| Devices to be Run by Generator: Refrigerator |
| Devices to be Run by Generator: Regular house lighting |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: kholer generator installation <br /> |
|
|
|
| Project Name: Install a Generator |
| Project Location: Milford, NH |
| Date: 11/29/2011 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Heating and A/C |
| Devices to be Run by Generator: Refrigerator |
| Devices to be Run by Generator: Regular house lighting |
| Devices to be Run by Generator: Specific outlets |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: I need a transfer switch installed for a recently purchased portable generator. |
|
|
|
| Project Name: Install a Generator |
| Project Location: Milford, NH |
| Date: 11/28/2011 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Specific outlets |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: I have a 6500 watt Generac portable generator on order. I would like a free estimate on the different methods I could transfer safely power from the Main Fuse box to the generator. |
|
|
|
| Project Name: Repair a Generator |
| Project Location: Milford, NH |
| Date: 11/21/2011 |
| Type of Generator Repair: Won't start |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Milford, NH |
| Date: 11/20/2011 |
| Services Needed: Install new switches, fixtures or outlets |
| What kind of location is this?: Home/Residence |
| After Business Hours: No |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Electrical fixtures : Ceiling fan or chandelier |
| Comment: Installing a ceiling fan/light - need 2 switches (one on/off, one dimmer for light only) running into problem figuring out wiring from box in ceiling to 2 diffent switches |
|
|
|
| Project Name: Install a Generator |
| Project Location: Milford, NH |
| Date: 11/17/2011 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Heating and A/C |
| Devices to be Run by Generator: Other |
| Devices to be Run by Generator: Refrigerator |
| Devices to be Run by Generator: Regular house lighting |
| Devices to be Run by Generator: Water heater |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Looking to install necessary wiring for use of the portable generator |
|