

|
 |
Prescreened Electricians - Manchester, NH (New Hampshire)

Unscreened Electrical Contractors - Manchester, NH
Boisvert
149 Eve St, Manchester, NH 03104
Related Projects for Electrical in Manchester, NH
Narrow your search by choosing one of these specific Electrical services.
|
|
Not Looking for Electricians in Manchester, NH?
If you're looking for Electricians that serve a different city in New Hampshire, here are some popular suggestions:

Find additional New Hampshire Electricians
|
|
Recent Job Requests for Electricians in Manchester, New Hampshire
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Manchester, NH |
| Date: 02/08/2012 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures - For Business |
| Project Location: Manchester, NH |
| Date: 02/03/2012 |
| What kind of location is this?: Business |
| Comment: I need an estimate for 16 cubicles wired office. |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Manchester, NH |
| Date: 01/28/2012 |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Project description: Update or add a few fixtures, outlets or switches |
| Property Owner: Yes |
| Comment: outlets arent grounded. home inspector says the wiring is present just needs to be connected, also a live wire is in attic and needs to be capped |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Manchester, NH |
| Date: 01/28/2012 |
| Services Needed: Repair or replace an old switch, fixture or outlet |
| What kind of location is this?: Home/Residence |
| After Business Hours: Yes |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Electrical fixtures : Outlets |
| Electrical fixtures : Bath or attic exhaust fan |
|
|
|
| Project Name: Repair a Generator |
| Project Location: Manchester, NH |
| Date: 01/25/2012 |
| Type of Generator: Portable |
| Type of Generator Repair: Other |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: 2009 honeywell hw5500 used 3 times. fryed heating system control board, 3 pc power supplies and 4 surge protectors over the 3 uses. |
|
|
|
| Project Name: Install a Generator |
| Project Location: Manchester, NH |
| Date: 01/12/2012 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Entire house |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: upgrade to home in planning and permitting process. would like to add full house generator as part of process. |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Manchester, NH |
| Date: 01/11/2012 |
| Services Needed: Install new switches, fixtures or outlets |
| What kind of location is this?: Home/Residence |
| After Business Hours: No |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Electrical fixtures : Outlets |
| Comment: I have one outlet in my basement. Looking to add a couple others, basement is dry walled, open ceiling, main outlet is about 5 feet from the panel. |
|
|
|
| Project Name: Install a Generator |
| Project Location: Manchester, NH |
| Date: 12/31/2011 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Heating and A/C |
| Devices to be Run by Generator: Refrigerator |
| Devices to be Run by Generator: Regular house lighting |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Need LNG fueled stand by unit |
|
|
|
| Project Name: Install a Generator |
| Project Location: Manchester, NH |
| Date: 12/30/2011 |
| Describe Generator Use: Emergency back-up power |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Need a transfer switch set up for a raised ranch in manchester, nh. the generator is a Gentron 10,000 watt and it will do my whole house. Please price with and without you folks supplying the transfer kit. thanks, James grant xxxxxxxxxxxxxxxxxxxxxxxx |
|
|
|
| Project Name: Install a Generator |
| Project Location: Manchester, NH |
| Date: 12/29/2011 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Emergency lighting |
| Devices to be Run by Generator: Heating and A/C |
| Devices to be Run by Generator: Refrigerator |
| Devices to be Run by Generator: Water heater |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
|
|
ServiceMagic Pros Are...

|