|
|
| Project Name: Upgrade an Electrical Panel or Wiring |
| Project Location: Lee, NH |
| Date: 01/18/2012 |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Project description: Electrical panel upgrade only |
| Property Owner: Yes |
| Comment: replacement of existing 20 amp generator panel with 30 amp generator panel. |
|
|
|
| Project Name: Install a Generator |
| Project Location: Lee, NH |
| Date: 12/03/2011 |
| Comment: estimate for installing a generator for a standby back up unit |
|
|
|
| Project Name: Install a Generator |
| Project Location: Lee, NH |
| Date: 11/11/2011 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Emergency lighting |
| Devices to be Run by Generator: Heating and A/C |
| Devices to be Run by Generator: Refrigerator |
| Devices to be Run by Generator: Specific outlets |
| Devices to be Run by Generator: Water heater |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Looking for the wiring to be done for a backup generator. Including a 10 slot transfer switch |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Lee, NH |
| Date: 09/12/2011 |
| What kind of location is this?: Home/Residence |
| After Business Hours: No |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Electrical fixtures : Other fixtures |
| Comment: installing hood over range and installing hose for new refrigerator water/ice on door. |
|
|
|
| Project Name: Upgrade an Electrical Panel or Wiring |
| Project Location: Lee, NH |
| Date: 11/23/2010 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Project description: Electrical panel upgrade only |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Lee, NH |
| Date: 10/01/2010 |
| Services Needed: Install new switches, fixtures or outlets |
| What kind of location is this?: Home/Residence |
| After Business Hours: No |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Electrical fixtures : Ceiling fan or chandelier |
| Electrical fixtures : Other fixtures |
| Comment: ceiling fan installed and power switch to turn off heat tape for manufactured home |
|
|
|
| Project Name: Repair a Generator |
| Project Location: Lee, NH |
| Date: 08/26/2010 |
| Type of Generator: Fixed |
| Type of Generator Repair: General maintenance |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: New standby generator installed and need to find some one for routine maintenance of it |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures - For Business |
| Project Location: Lee, NH |
| Date: 08/06/2010 |
| Comment: I am in the process of buying a home in NH and we have a closing at the end of Aug. There is electric heat that needs to be fixed - 3 baseboards need to be replaced. The electirc box needs to be upgraded. |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Lee, NH |
| Date: 01/24/2010 |
| Consumer Owns Home: Yes |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Project description: Update or add a few fixtures, outlets or switches |
| Comment: I want to install overhead lights in my kids bedrooms. The house was built in 2006. The builder tried to make everything easy to install. |
|