| Project Name: Install a Generator |
| Project Location: Guilford, CT |
| Date: 01/20/2012 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Entire house |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: We need an electrician to hook up a 5500 KW generator and provide us a switch to operate the hosue when the main power goes down. |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Guilford, CT |
| Date: 01/13/2012 |
| Services Needed: Troubleshoot an electrical problem |
| What kind of location is this?: Home/Residence |
| After Business Hours: No |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Emergency Service |
| Request Stage: Ready to Hire |
| Electrical fixtures : Outlets |
| Electrical fixtures : Switches |
| Electrical fixtures : Interior lights |
| Comment: outlets not working in one zone of the house. breaker does not seem to the solution have seen sparks in outlets |
|
|
|
| Project Name: Upgrade an Electrical Panel or Wiring |
| Project Location: Guilford, CT |
| Date: 12/26/2011 |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Project description: Electrical panel upgrade only |
| Property Owner: Yes |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Guilford, CT |
| Date: 12/09/2011 |
| Services Needed: Install new switches, fixtures or outlets |
| What kind of location is this?: Home/Residence |
| After Business Hours: No |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Electrical fixtures : Switches |
| Electrical fixtures : Interior lights |
| Comment: Install 2 new light fittings. Check and if necessary replace old dimmer switches. <br /> |
|
|
|
| Project Name: Install Lightning Protection Systems |
| Project Location: Guilford, CT |
| Date: 11/29/2011 |
| Square footage of house: NA |
| Number of Stories: NA |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Property Owner: No |
| Comment: new house with metal roof |
|
|
|
| Project Name: Install a Generator |
| Project Location: Guilford, CT |
| Date: 11/19/2011 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Entire house |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
|
|
|
| Project Name: Install a Generator |
| Project Location: Guilford, CT |
| Date: 11/03/2011 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Entire house |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
|
|
|
| Project Name: Install a Generator |
| Project Location: Guilford, CT |
| Date: 11/01/2011 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Heating and A/C |
| Devices to be Run by Generator: Refrigerator |
| Devices to be Run by Generator: Regular house lighting |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: We live in Guilford CT. We own an all electric home with baseboard heaters in every room. Each heater has separate controls. We are interested in a GENERAC propane generator to provide power during an outage. We would like to energize only the heaters in rooms which have water, e.g., kitchen,bathrooms, and laundry room. We would also like to have refrigerator, water pump, and some lights. We have propane fireplaces in the master bedroom top floor and family room, main level, which we could use for heat in those rooms. The real question is can the selected heaters be separately connected to the generator through the main breaker panel in our basement. |
|
|
|
| Project Name: Install a Generator |
| Project Location: Guilford, CT |
| Date: 10/30/2011 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Entire house |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: to get price for entire house generator |
|
|
|
| Project Name: Install a Generator |
| Project Location: Guilford, CT |
| Date: 10/28/2011 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Emergency lighting |
| Devices to be Run by Generator: Heating and A/C |
| Devices to be Run by Generator: Other |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: set up a back up switch to plug in generator when power is lost. |
|