|
|
| Project Name: Upgrade an Electrical Panel or Wiring |
| Project Location: Fulton, NY |
| Date: 05/10/2012 |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Project description: Electrical panel upgrade only |
| Property Owner: Yes |
| Comment: fix ceiling light/ceiling fan wiring, stopped working. Also, need to fix a curcuit breaker switch to bathroom and hookup/fix heater and thermostat |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Fulton, NY |
| Date: 12/20/2011 |
| Services Needed: Troubleshoot an electrical problem |
| What kind of location is this?: Home/Residence |
| After Business Hours: No |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Electrical fixtures : Other fixtures |
| Comment: replace braker box and wires from braker to nationalgrid lines |
|
|
|
| Project Name: Install a Generator |
| Project Location: Fulton, NY |
| Date: 10/24/2011 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Entire house |
| Devices to be Run by Generator: Regular house lighting |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: have natural gas, want a whole house backup |
|
|
|
| Project Name: Upgrade an Electrical Panel or Wiring |
| Project Location: Fulton, NY |
| Date: 07/21/2011 |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Project description: Electrical panel upgrade only |
| Property Owner: Yes |
| Comment: estimate for upgrading electrical panel with 200 amp service |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Fulton, NY |
| Date: 06/20/2011 |
| Services Needed: Install new switches, fixtures or outlets |
| What kind of location is this?: Home/Residence |
| After Business Hours: No |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Electrical fixtures : Other fixtures |
| Comment: need a sitch box for a generator hooked up |
|
|
|
| Project Name: Install Electrical for a Home Addition or Remodel |
| Project Location: Fulton, NY |
| Date: 05/04/2011 |
| Electrical Devices: Ceiling fixtures/fans |
| Electrical Devices: Floor outlets |
| Electrical Devices: Other |
| Electrical Devices: Surge protection |
| Electrical Devices: Switches (standard) |
| Electrical Devices: Wall outlets |
| Rooms Included: Bathroom(s) |
| Rooms Included: Bedroom(s) |
| Rooms Included: Kitchen |
| Rooms Included: Living, Family, or Dining rooms |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Project description: Complete wiring for addition or remodel |
| Property Owner: Yes |
| Comment: Apartment-want new wiring, separation from garage, and installation of 2 electrical heaters |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures - For Business |
| Project Location: Fulton, NY |
| Date: 08/29/2010 |
| Services Needed: Repair or replace an old switch, fixture or outlet |
| Services Needed: Install new switches, fixtures or outlets |
| Services Needed: Move switches, fixtures or outlets |
| What kind of location is this?: Business |
| Timing: Within 1 Week |
| Type of Business: Retail/Restaurant |
| For how many locations/units is this request?: 1 |
| On-going: No |
| Electrical fixtures : Outlets |
| Electrical fixtures : Switches |
| Electrical fixtures : Bath or attic exhaust fan |
| Electrical fixtures : Interior lights |
| Comment: replace lights/add plugs |
|
|
|
| Project Name: Upgrade an Electrical Panel or Wiring |
| Project Location: Fulton, NY |
| Date: 05/06/2010 |
| Consumer Owns Home: Yes |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Project description: Electrical panel upgrade only |
| Comment: new service |
|
|
|
| Project Name: Upgrade an Electrical Panel or Wiring |
| Project Location: Fulton, NY |
| Date: 03/23/2010 |
| Consumer Owns Home: Yes |
| Historical Work: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Project description: Electrical panel upgrade only |
| Comment: inspecting breaker box before turning power back on |
|