|
|
| Project Name: Install a Generator |
| Project Location: Danville, NH |
| Date: 11/08/2011 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Entire house |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Need an LP stand by generator installed |
|
|
|
| Project Name: Install a Generator |
| Project Location: Danville, NH |
| Date: 11/01/2011 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Heating and A/C |
| Devices to be Run by Generator: Refrigerator |
| Devices to be Run by Generator: Specific outlets |
| Devices to be Run by Generator: Water heater |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Danville, NH |
| Date: 10/24/2011 |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Project description: Update or add a few fixtures, outlets or switches |
| Property Owner: Yes |
| Comment: old wiring |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Danville, NH |
| Date: 05/12/2011 |
| Comment: i need an estimate on flood light installed, I want to be able to activate when I come in |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Danville, NH |
| Date: 04/13/2011 |
| What kind of location is this?: Home/Residence |
| After Business Hours: Yes |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Electrical fixtures : Outlets |
| Comment: Shortage of a kitchen outlet that is situated on an outside wall of the house. Not sure if it is from water leakage or it just shorted out. There is no sign of water damage on that wall. The breaker tripped to off. If I turn it back on and plug something in, it smells hot and trips off again. |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Danville, NH |
| Date: 08/17/2010 |
| Services Needed: Troubleshoot an electrical problem |
| Services Needed: Repair or replace an old switch, fixture or outlet |
| Services Needed: Install new switches, fixtures or outlets |
| What kind of location is this?: Home/Residence |
| After Business Hours: No |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: need to have all circuits checked and repaired or replaced as necessary asap |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Danville, NH |
| Date: 05/05/2010 |
| Consumer Owns Home: Yes |
| Electrical Devices: Spa |
| Rooms Included: Patio or outdoors |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Project description: Update or add a few fixtures, outlets or switches |
| Comment: Installing a 220V/50amp hot tub on a deck approximately 12 feet from our house. |
|
|
|
| Project Name: Upgrade an Electrical Panel or Wiring |
| Project Location: Danville, NH |
| Date: 04/20/2010 |
| Consumer Owns Home: Yes |
| Historical Work: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Project description: Electrical panel upgrade only |
| Comment: upgrade exsisting service and add in generator capability, wire new garage, add ceiling light in dining room, misc outlets in house |
|
|
|
| Project Name: Upgrade an Electrical Panel or Wiring |
| Project Location: Danville, NH |
| Date: 02/26/2010 |
| Comment: need lights re-attached to house - weather problems - line attached to house is pulled out |
|
|
|
| Project Name: Install a Generator |
| Project Location: Danville, NH |
| Date: 12/16/2009 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Emergency lighting |
| Devices to be Run by Generator: Heating and A/C |
| Devices to be Run by Generator: Refrigerator |
| Devices to be Run by Generator: Water heater |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: Looking for quotes on installation of a manual transfer switch to use with a gas powered generator |
|