|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Brighton, MI |
| Date: 02/07/2012 |
| Services Needed: Install new switches, fixtures or outlets |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Electrical fixtures : Exterior lights |
| Comment: outdoor flood lights |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Brighton, MI |
| Date: 01/24/2012 |
| Comment: I need an est for bad light fixture, repair fixture or swictch, two way switch. |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Brighton, MI |
| Date: 01/19/2012 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: I need an estimate for running a 220 v line for a dryer. |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Brighton, MI |
| Date: 01/18/2012 |
| Services Needed: Move switches, fixtures or outlets |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
|
|
|
| Project Name: Upgrade an Electrical Panel or Wiring |
| Project Location: Brighton, MI |
| Date: 01/15/2012 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Project description: Electrical panel upgrade only |
| Comment: Replace meter box, connect to DTE line, new conduit wire from new meter to current box or e panel inside the house. |
|
|
|
| Project Name: Install a Generator |
| Project Location: Brighton, MI |
| Date: 01/02/2012 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Entire house |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: install automatic generator |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Brighton, MI |
| Date: 12/09/2011 |
| Services Needed: Move switches, fixtures or outlets |
| What kind of location is this?: Home/Residence |
| After Business Hours: No |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Electrical fixtures : Outlets |
| Comment: Just purchased house that had an electric range. We had a gas range installed, however the now unused 220 outlet is preventing the the new gas range from sliding farther in. Need the breaker and line pulled from the panel so that I can remove the outlet from the floor. <br /> |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Brighton, MI |
| Date: 12/06/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Comment: I need to get a chandaler installed in dinning rooms |
|
|
|
| Project Name: Install a Generator |
| Project Location: Brighton, MI |
| Date: 12/02/2011 |
| Describe Generator Use: Emergency back-up power |
| Devices to be Run by Generator: Entire house |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: House needs standby generator <br /> |
|
|
|
| Project Name: Install Electrical Switches, Outlets, and Fixtures |
| Project Location: Brighton, MI |
| Date: 11/26/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Project description: Update or add a few fixtures, outlets or switches |
|