| Project Name: Remodel to Accommodate a Disability - For Business |
| Project Location: Miami, FL |
| Date: 02/15/2012 |
| Kind of Residence: Unit on ground floor of multi-family residence (condo, townhouse, apartment etc.) |
| Nature of Disability: Impaired strength/motion range (reaching, bending, lifting) |
| Nature of Disability: Loss of balance, coordination |
| Nature of Disability: Sense of touch/dexterity (gripping, turning, twisting knobs etc.) |
| Nature of Disability: Wheelchair |
| Remodeling Needs: Bathroom(s) |
| Remodeling Needs: Bedroom(s) |
| Remodeling Needs: Closet(s) |
| Remodeling Needs: Flooring |
| Remodeling Needs: Interior doorway(s) |
| Remodeling Needs: Kitchen |
| Remodeling Needs: Need suggestions |
| Changes in Bathroom: Substitute a 36" counter and sink for a 84" counter with two sinks |
| Changes in Kitchen: Add/change lighting |
| Changes in Kitchen: Change doors to slide or swing out |
| Changes in Kitchen: Change faucets |
| Changes in Kitchen: Change/modify cabinets |
| Changes in Kitchen: Change/modify sink |
| Changes in Kitchen: Other |
| Changes in Kitchen: Would appreciate suggestions |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Insurance was taken care of. They took care of mold removers. They took down popcorn ceiling. They took up all Floors. They took out entire kitchen. All blinds down. Need. Floor for 1550 feet apartment .they prime rooms took down all old fixture and fans.took off wall paper from 3 bathroom prime walls polish floor and seal them in bathroom. In Florida to take care of it . |