|
|
| Project Name: Remodel to Accommodate a Disability |
| Project Location: Akron, OH |
| Date: 05/09/2012 |
| Building Type: Single family home |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
|
|
|
| Project Name: Build or Replace Wheelchair Ramps |
| Project Location: Akron, OH |
| Date: 05/02/2012 |
| Where Ramp Needed: Front door |
| Why a ramp: Use manual wheelchair |
| Ramp Material: Don't Know |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: 16 year old boy needs ramps on front and back door |
|
|
|
| Project Name: Build or Replace Wheelchair Ramps |
| Project Location: Akron, OH |
| Date: 03/24/2012 |
| Where Ramp Needed: Side door |
| Why a ramp: Use manual wheelchair |
| Ramp Material: Metal / Aluminum |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: mobile home, permission to install acquired, 32 inch sill height; side door as main entrance, under canopy porch with concrete floor |
|
|
|
| Project Name: Build or Replace Wheelchair Ramps |
| Project Location: Akron, OH |
| Date: 03/08/2012 |
| Where Ramp Needed: Front door |
| Why a ramp: Use a walker |
| Ramp Material: Wood |
| What kind of location is this?: Business |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: No |
| Comment: church front entrance |
|
|
|
| Project Name: Build or Replace Wheelchair Ramps |
| Project Location: Akron, OH |
| Date: 03/05/2012 |
| Where Ramp Needed: Other |
| Why a ramp: Use manual wheelchair |
| Ramp Material: Wood |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Comment: 23" rise from Garage floor to doorway going into a house. the garage size is 2.5 cars with only one car being used. |
|
|
|
| Project Name: Install an Elevator or Chair Lift - For Business |
| Project Location: Akron, OH |
| Date: 02/29/2012 |
| Location of Lift: Indoors |
| Kind of Elevator Lift: Home elevator with enclosed cab |
| Height Lift Must Rise: One story |
| What kind of location is this?: Business |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: two story office commercial building |
|
|
|
| Project Name: Install an Elevator or Chair Lift |
| Project Location: Akron, OH |
| Date: 01/09/2012 |
| Location of Lift: Indoors |
| Kind of Elevator Lift: Home elevator with enclosed cab |
| Height Lift Must Rise: One story |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
|
|
|
| Project Name: Build or Replace Wheelchair Ramps |
| Project Location: Akron, OH |
| Date: 08/09/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Comment: wheelchair ramp installed at my home. |
|
|
|
| Project Name: Install an Elevator or Chair Lift |
| Project Location: Akron, OH |
| Date: 08/01/2011 |
| Location of Lift: Indoors |
| Kind of Elevator Lift: Home elevator with enclosed cab |
| Height Lift Must Rise: Two stories |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: adding a three stop elevator to existing or new addition to our home |
|
|
|
| Project Name: Build or Replace Wheelchair Ramps |
| Project Location: Akron, OH |
| Date: 07/31/2011 |
| Where Ramp Needed: Side door |
| Why a ramp: Use manual wheelchair |
| Ramp Material: Wood |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Comment: My husband is coming home from a rehilbilitation center on 8/1/11 |
|