|
|
| Project Name: Design a Bathroom |
| Project Location: Fort Smith, AR |
| Date: 01/28/2012 |
| Project Description: Partial remodel |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Approximate Budget: $1000 - $5000 |
| Type of Bathroom: Guest bathroom |
| Areas Included: Bathtub |
| Areas Included: Flooring |
| Areas Included: Other |
| Areas Included: Shower |
| Property Owner: Yes |
| Comment: Looking into tearing shower wall and tub out. Replace with a tile and whirlpool or air bubble spa. Possibly replacing the flooring and looking at a couple of other ideas. After that, then possibly the master bath. Looking at tub being removed and converted to walkin shower only, with tile. |
|
|
|
| Project Name: Design a Building (Non-Architect) |
| Project Location: Fort Smith, AR |
| Date: 11/21/2011 |
| Project Type: Addition (two or more stories) |
| Specific Needs: Would like recommendation |
| Building Type: House |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Approximate Budget: Up to $1000 |
| Comment: I need residential designer for property damaged by tornado |
|
|
|
| Project Name: Landscape Designer |
| Project Location: Fort Smith, AR |
| Date: 04/19/2011 |
| Nature of project: Updating existing landscape |
| Square footage: Back yard |
| What is the approximate size of the area to be landscaped?: Medium (1,000 - 3,000 sq ft) |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: update back pool yard and outdoor entertainment area |
|
|
|
| Project Name: Design a Bathroom |
| Project Location: Fort Smith, AR |
| Date: 04/10/2011 |
| Project Description: Partial remodel |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Approximate Budget: $1000 - $5000 |
| Type of Bathroom: Guest bathroom |
| Areas Included: Countertops |
| Areas Included: Flooring |
| Areas Included: Paint |
| Areas Included: Shower |
| Areas Included: Toilet |
| Areas Included: Windows |
| Areas Included: Lighting / Electric |
| Areas Included: Sink / Plumbing fixtures |
| Areas Included: Cabinets / Vanity |
| Property Owner: Yes |
| Comment: need shower redone |
|
|
|
| Project Name: Landscape Designer |
| Project Location: Fort Smith, AR |
| Date: 04/05/2011 |
| Nature of project: Completely replace existing landscape |
| Square footage: Front yard |
| Square footage: Side yard |
| Who will install?: Will hire contractor to install |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Comment: down-sloping front yard. Would like less lawn and more low-maintenance beds, as well as redesigning the sprinkler system accordingly. Would also like lighting design. |
|
|
|
| Project Name: Landscape Designer |
| Project Location: Fort Smith, AR |
| Date: 04/01/2011 |
| Nature of project: New landscape from bare dirt |
| Square footage: Front yard |
| Square footage: Side yard |
| Who will install?: Don't Know |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Comment: We are looking to use the retaining wall bricks two high at one end, probably four high at the other end due to slope and are going to landscape along the front of our house, possible the side as well, pouring a new walk way and need ideas |
|
|
|
| Project Name: Landscape Designer |
| Project Location: Fort Smith, AR |
| Date: 03/02/2011 |
| Nature of project: Completely replace existing landscape |
| Square footage: Front yard |
| Who will install?: Don't Know |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Comment: Need easy to care for curb appeal... Have a lot of trees so leaf friendly and not a lot of upkeep... black thumb!!! |
|
|
|
| Project Name: Interior Decorator |
| Project Location: Fort Smith, AR |
| Date: 01/11/2011 |
| Project Type: Design consultation |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Rooms Included:: Dining room |
| Rooms Included:: Living room |
| Rooms Included:: Master Bedroom |
| Approximate Budget: Up to $1000 |
|
|
|
| Project Name: Interior Decorator |
| Project Location: Fort Smith, AR |
| Date: 10/03/2010 |
| Project Type: Design consultation |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Rooms Included:: Living room |
| Rooms Included:: Master Bedroom |
| Approximate Budget: Up to $1000 |
| Property Owner: Yes |
| Comment: i am open for any suggestion |
|
|
|
| Project Name: Interior Decorator |
| Project Location: Fort Smith, AR |
| Date: 09/27/2010 |
| Project Type: Small design projects around my home |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 3 - 6 months |
| Request Stage: Planning & Budgeting |
| Rooms Included:: Dining room |
| Rooms Included:: Entry |
| Rooms Included:: Kitchen |
| Rooms Included:: Living room |
| Approximate Budget: I don't know |
|