| Project Name: Repair or Resurface Concrete Driveways, Patios, Walks & Floors |
| Project Location: Guthrie, OK |
| Date: 02/07/2012 |
| Damage Description: Heaving or settling |
| Location of Repair/Resurface: Finish floor in a living space |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: we had a water leak and we got it fixed finally but now my kitchen is sliding down hill. |
|
|
|
| Project Name: Install Concrete Driveways & Floors |
| Project Location: Guthrie, OK |
| Date: 09/27/2011 |
| Type of Surface: Driveway/parking area |
| Type of Project: New concrete for existing home |
| Special applications/finishes: Brush textured finish (slip-resistant) |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: I need to get the best work and price for approx 3000 sq ft of concrete for driveway plus sidewalk and front porch on new home. |
|
|
|
| Project Name: Install Concrete Patios, Walks and Steps |
| Project Location: Guthrie, OK |
| Date: 09/26/2011 |
| Type of Surface: Exterior walkway or sidewalk |
| Type of Surface: Patio |
| Type of Project: New concrete for existing home |
| Special applications/finishes: Stamped to look like stone, brick or tile |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Would like to get the concrete stamped and put in a front patio as well. |
|
|
|
| Project Name: Install a Retaining Wall |
| Project Location: Guthrie, OK |
| Date: 09/15/2011 |
| Construction Material: Decorative poured concrete with simulated stone look |
| Construction Material: Poured concrete |
| Construction Material: Railroad ties |
| Construction Material: Stucco veneer |
| Needs: Drainage |
| Needs: Unsure |
| Wall Length: 50 - 100 ft |
| Wall Height: 5 - 6 ft |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: We have two projects, a drainage problem from the road down to our home and need some type of solution as well as probably retaining wall. In the back of the home we have a pond and need a retaining wall to go along the property edge leading down to the pond to preserve the soil and trees that are there. |
|
|
|
| Project Name: Install Concrete Driveways & Floors |
| Project Location: Guthrie, OK |
| Date: 09/11/2011 |
| Type of Surface: Interior floor |
| Type of Project: New concrete for existing home |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: need a concrete pad about 600 sq ft poured,as this has nothing but dirt and beams under flooring and moisture is eating away at flooring. |
|
|
|
| Project Name: Install a Poured Concrete Wall |
| Project Location: Guthrie, OK |
| Date: 07/29/2011 |
| Use of Wall: Retaining wall |
| Wall Length: 50 - 100 ft |
| Wall Height: 3 - 4 ft |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
|
|
|
| Project Name: Install a Poured Concrete Wall |
| Project Location: Guthrie, OK |
| Date: 07/26/2011 |
| Use of Wall: Retaining wall |
| Wall Length: 50 - 100 ft |
| Wall Height: 3 - 4 ft |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Retaining wall. I am putting up a retaining wall. I put 4" x 6" x 8' treated timbers 8' center to center in 1'-6" to 2' with 4" x 4" treated top rails. I want to place cement between each of the timbers up to 4' high 4" thick. Is this okay? |
|
|
|
| Project Name: Deliver Liquid Concrete |
| Project Location: Guthrie, OK |
| Date: 07/12/2011 |
| Comment: I am pouring a footing and stem wall for a peer and beam floor on a room addition |
|
|
|
| Project Name: Install Concrete Driveways & Floors |
| Project Location: Guthrie, OK |
| Date: 05/16/2011 |
| Type of Surface: Garage floor |
| Type of Project: New concrete for existing home |
| Special applications/finishes: Smooth trowel finished |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: garage floor 20 by 25 at least five inches thick |
|
|
|
| Project Name: Install Concrete Patios, Walks and Steps |
| Project Location: Guthrie, OK |
| Date: 03/21/2011 |
| Comment: I need a quote on a concrete patio approx 36' x 10' to attach to an existing covered patio. |
|