|
|
| Project Name: Install Interior Trim and Decorative Moldings |
| Project Location: Waukesha, WI |
| Date: 01/23/2012 |
| Features that Need Finish Work: Crown molding |
| Need Finish Carpeter/Woodworker: Don't Know |
| Number of Rooms: NA |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: need crown molding put up in 1 room in our house, already purchased white crown molding |
|
|
|
| Project Name: Install Carpentry Framing |
| Project Location: Waukesha, WI |
| Date: 11/28/2011 |
| Framing Material: Wood framing |
| Framing Needs: Other |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: needing an est on having floor built above the garage. |
|
|
|
| Project Name: Install Carpentry Framing |
| Project Location: Waukesha, WI |
| Date: 11/10/2011 |
| Project drawings: No |
| Framing Material: Wood framing |
| Framing Needs: Other |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Would like build in cabinets on boths sides of the fireplace. And putting in a window that I already have so both sides match. |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Waukesha, WI |
| Date: 11/09/2011 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame |
| Items Requiring Repair: Water leaking around glass |
| Type of Window: Casement |
| Window Frame Material: Wood |
| Comment: Upper window has been leaking for years. Put a drip edge on the top of the window. Calked several times <br />over the years and does not help. Leak from the top of the window frame onto the bottom window ledge <br />inside the house. |
|
|
|
| Project Name: Install Interior Trim and Decorative Moldings |
| Project Location: Waukesha, WI |
| Date: 11/06/2011 |
| Features that Need Finish Work: Floor molding |
| Doors & Windows to be Installed: Interior doors |
| Need Finish Carpeter/Woodworker: Don't Know |
| Number of Rooms: NA |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: My husband started the job. We have all the materials. My husband completed one room, installing a closet and replacing all the molding. The job is just to much for him time wise, so we are looking for someone to complete this project. |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Waukesha, WI |
| Date: 11/01/2011 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Type of Repair Required: Frame & Glass |
| Items Requiring Repair: Install New Glass |
| Window Frame Material: Wood |
| Comment: rock went through bathroom window want to replace with glass block |
|
|
|
| Project Name: Repair Carpentry Framing |
| Project Location: Waukesha, WI |
| Date: 10/17/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Comment: I need I have a formal living finish the top of the area where the french doors were removed. |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Waukesha, WI |
| Date: 09/24/2011 |
| After Business Hours: Yes |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame |
| Items Requiring Repair: Broken latch |
| Window Frame Material: Vinyl |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Waukesha, WI |
| Date: 09/23/2011 |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame & Glass |
| Items Requiring Repair: Moisture between panes of glass |
| Items Requiring Repair: Broken latch |
| Items Requiring Repair: Block and tackle (pulley) |
| Items Requiring Repair: Crank Malfunction |
| Items Requiring Repair: Window Sticks |
| Items Requiring Repair: Hinge |
| Items Requiring Repair: Window is jammed |
| Items Requiring Repair: Deteriorated wood |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Waukesha, WI |
| Date: 09/21/2011 |
| After Business Hours: Yes |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame |
| Items Requiring Repair: Broken latch |
| Type of Window: Bay |
| Window Frame Material: Vinyl |
|