|
| Project Name: Repair Window Frames |
| Project Location: Washington, DC |
| Date: 05/26/2012 |
| Is this an emergency?: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame & Glass |
| Items Requiring Repair: Moisture between panes of glass |
| Items Requiring Repair: Water damage around frame |
| Items Requiring Repair: Deteriorated wood |
| Comment: Window frame and surrounding plaster have water damage. Several windows have cracked glass, and moisture between panes. All need caulking. |
|
|
| Project Name: Repair Carpentry Framing |
| Project Location: Washington, DC |
| Date: 05/22/2012 |
| Framing to be Repaired: Other |
| Dry Rot or Water Damage: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Front Door Frame Repair. Wooden Frame. |
|
|
| Project Name: Repair Carpentry Framing |
| Project Location: Washington, DC |
| Date: 05/21/2012 |
| Framing to be Repaired: Roof framing |
| Dry Rot or Water Damage: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Comment: Remove and replacing a roof for a Georgetown home. Will need to replace damaged sheathing once existing shingles have been removed. Will be working with the contractor on the job. |
|
|
| Project Name: Install Carpentry Framing |
| Project Location: Washington, DC |
| Date: 05/20/2012 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: 1. Strip, re-finish (dustless) three bedroom, hallway original hardwood floors, including installation of floor molding to close gap opening between existing molding and floor. 2. Re-buff (dustless) first floor hardware floors 3. Remove 2 walls and install one between 2 bedrooms and re-design existing closet storage compartments 4. Move existing furnace 1-2 feet from current position to allow greater ease of entry |
|
|
|
| Project Name: Install or Replace Wood Stairs and Railings |
| Project Location: Washington, DC |
| Date: 05/18/2012 |
| Stair Construction: Open on two sides (railings on both sides) |
| Type of Stairs: Exterior |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: No |
| Comment: Brick stairs on exterior of home need railing to pass VA saftey requirements. There is also stairs on inside that need railing for saftey requirements. The borrower also needs to repair peeling paint around exterior windows and doors as well as install ventilation for the dryer. |
|
|
|
| Project Name: Install Carpentry Framing |
| Project Location: Washington, DC |
| Date: 05/18/2012 |
| Project drawings: Yes |
| Framing Material: Wood framing |
| Framing Needs: Addition onto an existing home |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
|
|
|
| Project Name: Install Carpentry Framing |
| Project Location: Washington, DC |
| Date: 05/18/2012 |
| Project drawings: Yes |
| Framing Material: Wood framing |
| Framing Needs: Other |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Job entails removing cracked beam and 12 trusses from roof and installing new trusses and 3 beams. Involves collaborating with roofer I would suppose. |
|
|
|
| Project Name: Install Carpentry Framing |
| Project Location: Washington, DC |
| Date: 05/16/2012 |
| Project drawings: Yes |
| Framing Material: Wood framing |
| Framing Needs: Entire house as part of new home construction |
| Framing Needs: Interior framing for remodel project |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Real Estate Investment company looking to hire someone for FRAMING. House is Gutted, permits are pulled. We finance our own project and pay upon completion. First of Three projects; 1500 SF, 3 Level Rowhouse. |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Washington, DC |
| Date: 05/15/2012 |
| Is this an emergency?: No |
| After Business Hours: Yes |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame |
| Items Requiring Repair: Crank Malfunction |
| Type of Window: Double-hung (both halves open) |
| Window Frame Material: Vinyl |
| Comment: One of the windows in my property has a bad spring, such that one of the window panes won't close all of the way - so I need to get it fixed. |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Washington, DC |
| Date: 05/13/2012 |
| Is this an emergency?: No |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame & Glass |
| Items Requiring Repair: Install New Glass |
| Items Requiring Repair: Moisture between panes of glass |
| Type of Window: Double-hung (both halves open) |
| Window Frame Material: Vinyl |
| Comment: Need to have glass replaced in 2 windows in the bedroom. |
|