|
|
| Project Name: Install Carpentry Framing |
| Project Location: Vineland, NJ |
| Date: 11/11/2011 |
| Project drawings: No |
| Framing Material: Don't Know |
| Framing Needs: Other |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Had a leak and the wall and floor were damaged. Need to replace part of the wall and the floor with tile. |
|
|
|
| Project Name: Repair Carpentry Framing |
| Project Location: Vineland, NJ |
| Date: 11/06/2011 |
| Framing to be Repaired: Ceiling joists |
| Framing to be Repaired: Exterior walls |
| Framing to be Repaired: Floor |
| Dry Rot or Water Damage: Yes |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Water and insect damage to sill under front door. I need the damage accessed and estimate for repair |
|
|
|
| Project Name: Install Interior Trim and Decorative Moldings |
| Project Location: Vineland, NJ |
| Date: 10/27/2011 |
| Features that Need Finish Work: Floor molding |
| Need Finish Carpeter/Woodworker: Don't Know |
| Number of Rooms: NA |
| Number of Rooms: NA |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
|
|
|
| Project Name: Install or Replace Wood Stairs and Railings |
| Project Location: Vineland, NJ |
| Date: 10/15/2011 |
| Stair Construction: Open on one side (railing on one side, wall on the other) |
| Type of Stairs: Exterior |
| What kind of location is this?: Business |
| Historical Work: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
|
|
|
| Project Name: Install or Replace Wood Stairs and Railings |
| Project Location: Vineland, NJ |
| Date: 10/12/2011 |
| Stair Construction: Open on two sides (railings on both sides) |
| Type of Stairs: Exterior |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: The wooden front stairs need to be replaced, as they are tilting down and are unsafe for the tenant. |
|
|
|
| Project Name: Install Interior Trim and Decorative Moldings |
| Project Location: Vineland, NJ |
| Date: 09/28/2011 |
| Features that Need Finish Work: Crown molding |
| Features that Need Finish Work: Wall molding - paneling, wainscoting and chair rail |
| Doors & Windows to be Installed: None |
| Need Finish Carpeter/Woodworker: No |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: 3 rooms, foyer + up stairs hall need crown molding. |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Vineland, NJ |
| Date: 08/24/2011 |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame & Glass |
| Comment: I need window glazing, 17 windows |
|
|
|
| Project Name: Build a New Closet |
| Project Location: Vineland, NJ |
| Date: 06/27/2011 |
| Closet Features: Closet rod for hanging clothes |
| Closet Features: Lighting |
| Closet Features: Other |
| Location of Closet: Laundry / utility room |
| Location of Closet: Master Bedroom |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Part of a larger home remodel?: No |
| Property Owner: Yes |
| Comment: I need a closet about 7'H X 11'W X 24"D <br />and another one 7'H X 6 1/2'W X 24"D I want sliding doors on both, |
|
|
|
| Project Name: Build a Custom Arbor, Pergola or Trellis |
| Project Location: Vineland, NJ |
| Date: 06/17/2011 |
| Project Type: New structure for covering deck, patio, walkway, etc. |
| Design Preparation: None |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Type of Structure: Pergola |
| Material Desired: Would like recommendation |
| Property Owner: Yes |
| Comment: i have a paver patio and need a pergola for shade. |
|
|
|
| Project Name: Install or Replace Wood Stairs and Railings |
| Project Location: Vineland, NJ |
| Date: 05/20/2011 |
| Stair Construction: Open on one side (railing on one side, wall on the other) |
| What kind of location is this?: Home/Residence |
| Looking For:: Quotes |
| Contact Preference:: Have Pro call to discuss project |
| Comment: Currently renovating a property in Brigantine and need to replace railings on the stairs. Our contractor is no help. Please call meat xxxxxxxxxxxx or email at xxxxxxxxxxxxxxxxxx |
|