|
|
| Project Name: Repair Window Frames |
| Project Location: Safety Harbor, FL |
| Date: 03/11/2012 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame |
| Items Requiring Repair: Window is jammed |
| Type of Window: Single-hung (lower half opens) |
| Window Frame Material: Aluminum |
| Comment: have about 4 windows that are very hard to slide open |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Safety Harbor, FL |
| Date: 02/27/2012 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame |
| Items Requiring Repair: Block and tackle (pulley) |
| Items Requiring Repair: Window is jammed |
| Type of Window: Single-hung (lower half opens) |
| Window Frame Material: Aluminum |
| Is this an emergency?: No |
| Comment: window spring is broken and will not close |
|
|
|
| Project Name: Repair Carpentry Framing |
| Project Location: Safety Harbor, FL |
| Date: 02/21/2012 |
| Framing to be Repaired: Roof framing |
| Dry Rot or Water Damage: Yes |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: facia boards are rotting at corner joint below drip line of gutter |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Safety Harbor, FL |
| Date: 12/30/2011 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Repair Required: Frame |
| Window Frame Material: Aluminum |
| Comment: aluminum frame in sliding windows are coming loose (broken in some windows). |
|
|
|
| Project Name: Build a Custom Arbor, Pergola or Trellis |
| Project Location: Safety Harbor, FL |
| Date: 11/21/2011 |
| Project Type: New structure for covering deck, patio, walkway, etc. |
| Design Preparation: None |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Type of Structure: Pergola |
| Material Desired: Synthetic/Composite material |
| Property Owner: Yes |
| Comment: cover concrete lanai with solid roof and screen in area for outdoor living. |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Safety Harbor, FL |
| Date: 10/24/2011 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame |
| Items Requiring Repair: Block and tackle (pulley) |
| Type of Window: Single-hung (lower half opens) |
| Window Frame Material: Aluminum |
| Comment: acquired replacement block and tackle but somehow have jammed when installing |
|
|
|
| Project Name: Repair Carpentry Framing |
| Project Location: Safety Harbor, FL |
| Date: 07/15/2011 |
| Dry Rot or Water Damage: Yes |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: wet particule board to be replaced |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Safety Harbor, FL |
| Date: 05/18/2011 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame |
| Items Requiring Repair: Hinge |
| Items Requiring Repair: Window is jammed |
| Window Frame Material: Aluminum |
| Comment: Window frame has to be reshaped after it was forced open |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Safety Harbor, FL |
| Date: 12/02/2010 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame |
| Items Requiring Repair: Need Screens |
| Window Frame Material: Aluminum |
| Comment: need 2 screens fixed or replaced on 2 windows |
|
|
|
| Project Name: Install Interior Trim and Decorative Moldings |
| Project Location: Safety Harbor, FL |
| Date: 11/11/2010 |
| Features that Need Finish Work: Crown molding |
| Features that Need Finish Work: Shelving |
| Need Finish Carpeter/Woodworker: Don't Know |
| Number of Rooms: NA |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: I want to construct shelving on one side of a fireplace to generally match existing shelving on the other. The shelving to be constructed would be used to hold a flat screen TV and associated electronics. I also want to get a quote on crown molding for living room and mbr |
|