|
|
| Project Name: Repair Wood Stairs and Railings |
| Project Location: Portage, MI |
| Date: 04/09/2012 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Comment: I am needing an est to replace a wood railing on a deck. It is pressure treated pine. |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Portage, MI |
| Date: 03/19/2012 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame |
| Items Requiring Repair: Hinge |
| Items Requiring Repair: Water damage around frame |
| Type of Window: Casement |
| Window Frame Material: Vinyl |
| Comment: Need new casement window hinges and bottom vinyl seal repair. Work needs to be done on 3 windows. Also, all three screens can not be installed-have all 3 screens. |
|
|
|
| Project Name: Install or Replace Wood Stairs and Railings |
| Project Location: Portage, MI |
| Date: 12/20/2011 |
| Stair Construction: Open on one side (railing on one side, wall on the other) |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: set newel posts, attach railing, plan baluster location |
|
|
|
| Project Name: Install Interior Trim and Decorative Moldings |
| Project Location: Portage, MI |
| Date: 12/17/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: crown and floor molding |
|
|
|
| Project Name: Install Carpentry Framing |
| Project Location: Portage, MI |
| Date: 12/16/2011 |
| What kind of location is this?: Business |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
|
|
|
| Project Name: Install Interior Trim and Decorative Moldings |
| Project Location: Portage, MI |
| Date: 12/16/2011 |
| What kind of location is this?: Business |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Comment: I need all carpentry framing done for a FINISH LINE store at the Crossroads Mall |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Portage, MI |
| Date: 11/09/2011 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame & Glass |
| Items Requiring Repair: Water leaking around glass |
| Items Requiring Repair: Moisture between panes of glass |
| Window Frame Material: Wood Clad |
| Comment: pella glass sun room needs calking replace a few sealed units seal failed out of warrenty need to preserve to get through winter |
|
|
|
| Project Name: Install Carpentry Framing |
| Project Location: Portage, MI |
| Date: 11/07/2011 |
| Project drawings: No |
| Framing Material: Wood framing |
| Framing Needs: Interior framing for remodel project |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Remove wall between kitchen and living room. <br />Size header (13feet long) and put in place. <br />No drywall work required. |
|
|
|
| Project Name: Install Interior Trim and Decorative Moldings |
| Project Location: Portage, MI |
| Date: 10/09/2011 |
| Comment: we have a general contracting co and i have a library den room i need an estimate |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Portage, MI |
| Date: 09/25/2011 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame |
| Items Requiring Repair: Water leaking around glass |
| Type of Window: Double-hung (both halves open) |
| Window Frame Material: Wood |
| Comment: water leaks in a couple of times per year; when there is high wind and heavy rain from the west. Water comes in at the top of the window (maybe above the frame) |
|