|
|
| Project Name: Install or Replace Wood Stairs and Railings |
| Project Location: Palm Harbor, FL |
| Date: 01/24/2012 |
| Stair Construction: Open on one side (railing on one side, wall on the other) |
| Type of Stairs: Interior painted |
| Type of Stairs: Interior stained |
| Type of Stairs: Landing mid-stair |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: I need a quote on a oak staircase with one landing and right hand turn |
|
|
|
| Project Name: Install Carpentry Framing |
| Project Location: Palm Harbor, FL |
| Date: 01/12/2012 |
| Project drawings: Yes |
| Framing Material: Wood framing |
| Framing Needs: Entire house as part of new home construction |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: 7,500 square foot new home on Lake Tarpon in Palm Harbor, FL |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Palm Harbor, FL |
| Date: 10/17/2011 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame |
| Items Requiring Repair: Crank Malfunction |
| Items Requiring Repair: Window is jammed |
| Type of Window: Double-hung (both halves open) |
| Window Frame Material: Aluminum |
| Comment: Need all 12 windows to properly open and close. |
|
|
|
| Project Name: Repair Carpentry Framing |
| Project Location: Palm Harbor, FL |
| Date: 10/10/2011 |
| Framing to be Repaired: Other |
| Dry Rot or Water Damage: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Remove and repair molding in the kitchen surrounding microwave. Reinstall when repair is complete. <br /> <br /> <br /> |
|
|
|
| Project Name: Install Interior Trim and Decorative Moldings |
| Project Location: Palm Harbor, FL |
| Date: 09/03/2011 |
| Comment: book cases trim and replace front of cabinets in kitchen booksheoves & storage in study |
|
|
|
| Project Name: Build a Custom Arbor, Pergola or Trellis |
| Project Location: Palm Harbor, FL |
| Date: 08/16/2011 |
| Project Type: New structure for covering deck, patio, walkway, etc. |
| Design Preparation: None |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Structure: Pergola |
| Material Desired: Cedar |
| Material Desired: Synthetic/Composite material |
| Property Owner: Yes |
| Comment: To modernize appearance of front of house, cover walkway and add a seating area. |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Palm Harbor, FL |
| Date: 07/29/2011 |
| Comment: Weep hole system, sun room, has sliders, weep holes not working. Is there a way to repair the weep hole system. |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Palm Harbor, FL |
| Date: 07/28/2011 |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame |
| Items Requiring Repair: Water leaking around glass |
| Items Requiring Repair: Water damage around frame |
| Items Requiring Repair: Deteriorated wood |
| Type of Window: Fixed (non-opening picture window) |
| Comment: I manage a condo complex in Palm Harbor, we have quite a few leaks in windows that need to be reapired. |
|
|
|
| Project Name: Build a New Closet |
| Project Location: Palm Harbor, FL |
| Date: 05/23/2011 |
| Closet Features: Built-in shelves |
| Closet Features: Other |
| Closet Features: Wall texture |
| Location of Closet: Hallway |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Part of a larger home remodel?: No |
| Property Owner: Yes |
| Comment: finish interior move door dry wall move thermostat lower ceiling |
|
|
|
| Project Name: Repair Carpentry Framing |
| Project Location: Palm Harbor, FL |
| Date: 04/21/2011 |
| Framing to be Repaired: Roof framing |
| Dry Rot or Water Damage: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: i would like to add gable end bracing in my attic |
|