| Project Name: Install Carpentry Framing |
| Project Location: Milwaukee, WI |
| Date: 02/04/2012 |
| Project drawings: No |
| Framing Material: Wood framing |
| Framing Needs: Second story addition |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Adding a shed dormer to the 2nd floor of my cape cod |
|
|
|
| Project Name: Repair Interior Trim and Decorative Moldings |
| Project Location: Milwaukee, WI |
| Date: 02/04/2012 |
| What kind of location is this?: Home/Residence |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Need Trim repair, Window/screen repair/ replacement, Drywall repair (minor), Cabinet hardware repair |
|
|
|
| Project Name: Install Carpentry Framing |
| Project Location: Milwaukee, WI |
| Date: 01/29/2012 |
| Project drawings: No |
| Framing Material: Wood framing |
| Framing Needs: Other |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: basement stairs in existing home were removed as part of remodel. Temp stairs have been in place and we are not ready for permanent stairs. Due to some new construction issues, this is not completely straightforward, so we are looking for experienced carpenters. |
|
|
|
| Project Name: Build a New Closet |
| Project Location: Milwaukee, WI |
| Date: 01/22/2012 |
| Closet Features: Built-in shelves |
| Closet Features: Closet rod for hanging clothes |
| Closet Features: Lighting |
| Location of Closet: Bedroom |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Comment: We would like to build a built-in to the wall closet/storage unit in the guest bedroom. |
|
|
|
| Project Name: Install Carpentry Framing |
| Project Location: Milwaukee, WI |
| Date: 01/10/2012 |
| Project drawings: Yes |
| Framing Material: Wood framing |
| Framing Needs: Addition onto an existing home |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: addition |
|
|
|
| Project Name: Install Interior Trim and Decorative Moldings |
| Project Location: Milwaukee, WI |
| Date: 01/10/2012 |
| Features that Need Finish Work: Door casing |
| Features that Need Finish Work: Floor molding |
| Features that Need Finish Work: Window casing |
| Number of Rooms: NA |
| Number of Rooms: 1 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Milwaukee, WI |
| Date: 01/02/2012 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame |
| Items Requiring Repair: Glass is loose |
| Type of Window: Double-hung (both halves open) |
| Window Frame Material: Aluminum |
| Comment: Window casing unglued; needs to be put back on; upper story window, need long ladder. |
|
|
|
| Project Name: Install or Replace Wood Stairs and Railings |
| Project Location: Milwaukee, WI |
| Date: 12/12/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Comment: estimate for installing attic stairs, pull down ceiling doors |
|
|
|
| Project Name: Install Interior Trim and Decorative Moldings |
| Project Location: Milwaukee, WI |
| Date: 12/12/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: I need an estimate exterior trim repair. |
|
|
|
| Project Name: Install Carpentry Framing |
| Project Location: Milwaukee, WI |
| Date: 12/11/2011 |
| Project drawings: No |
| Framing Material: Wood framing |
| Framing Needs: Interior framing for remodel project |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: a small framing project for my basement framing the hallwayto basement frame out 3 doors frame out 2 poles frame a studio booth for recording music simple project frame out a exsiting wall. <br /> |
|