|
| Project Name: Repair Window Frames |
| Project Location: Madison, WI |
| Date: 02/11/2012 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame |
| Type of Window: Bow |
| Window Frame Material: Wood |
| Comment: I have a bow window that is drafty. I would like to get it sealed |
|
|
| Project Name: Repair Wood Stairs and Railings |
| Project Location: Madison, WI |
| Date: 02/06/2012 |
| Kind of stairs: Interior |
| Problem(s): Unstable staircase |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Stairs move when walked on |
|
|
|
| Project Name: Install Interior Trim and Decorative Moldings |
| Project Location: Madison, WI |
| Date: 01/17/2012 |
| Features that Need Finish Work: Floor molding |
| Doors & Windows to be Installed: None |
| Need Finish Carpeter/Woodworker: Don't Know |
| Number of Rooms: NA |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Need estimate to install baseboard and round molding. Having new wood laminate flooring installed by homeowners. They will not cover new trim to match flooring. I will purchase the material. I just need it to be installed. |
|
|
|
| Project Name: Install Carpentry Framing |
| Project Location: Madison, WI |
| Date: 12/27/2011 |
| Project drawings: Yes |
| Framing Material: Don't Know |
| Framing Needs: Other |
| Interested in Green Alternatives: No |
| What kind of location is this?: Business |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Interior walls built for a new Salon opeining in existing building. Approximately 100 linear feet. |
|
|
|
| Project Name: Install Carpentry Framing |
| Project Location: Madison, WI |
| Date: 12/19/2011 |
| Framing Material: Don't Know |
| What kind of location is this?: Business |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: framing for a basment of a business. |
|
|
|
| Project Name: Install Carpentry Framing |
| Project Location: Madison, WI |
| Date: 12/06/2011 |
| Project drawings: No |
| Framing Material: Wood framing |
| Framing Needs: Interior framing for remodel project |
| Interested in Green Alternatives: No |
| What kind of location is this?: Business |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: structural framing for addition of 3 rooms for small business in Sun Prairie, WI. <br /> |
|
|
|
| Project Name: Install Carpentry Framing |
| Project Location: Madison, WI |
| Date: 12/06/2011 |
| Framing Material: Metal framing |
| Framing Needs: Other |
| What kind of location is this?: Business |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: 2-story steel stud framed assisted living addition 47000 sf |
|
|
|
| Project Name: Install Carpentry Framing |
| Project Location: Madison, WI |
| Date: 11/28/2011 |
| Project drawings: Yes |
| Framing Material: Metal framing |
| Framing Needs: Entire house as part of new home construction |
| Interested in Green Alternatives: No |
| What kind of location is this?: Business |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: 2-story steel stud framed assisted living addition 47000 sf |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Madison, WI |
| Date: 10/31/2011 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame & Glass |
| Items Requiring Repair: Moisture between panes of glass |
| Type of Window: Fixed (non-opening picture window) |
| Window Frame Material: Wood |
| Comment: I have 3 thermopane windows with broken seals that I need fixed by 11/11 |
|
|
|
| Project Name: Build a New Closet |
| Project Location: Madison, WI |
| Date: 10/20/2011 |
| Closet Features: Built-in shelves |
| Location of Closet: Bedroom |
| Location of Closet: Entryway / foyer |
| Location of Closet: Hallway |
| Location of Closet: Master Bedroom |
| What kind of location is this?: Business |
| Historical Work: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Part of a larger home remodel?: No |
| Property Owner: Yes |
| Comment: I work at a apt. in need of (7) closets. They are to be framed in existing openings, rocked, and pre-hung doors installed. I will mud and trim. I will have a plan and materials ready. |
|