|
| Project Name: Repair Carpentry Framing |
| Project Location: Largo, FL |
| Date: 05/22/2012 |
| Framing to be Repaired: Exterior walls |
| Dry Rot or Water Damage: Yes |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: LIVE AT TALLPNES TOWNHOMES I OWN A 2 STORY TOWNHOUSE NEED WOOD REPLACE IN BACK OF BUILDING, I THINK IT'S CALLED (T 11) ROTTON FROM BOTTOM OF WINDOW DOWN TO THE TOP OF PATIO ROOF 2ND STORY. MEASURES ABOUT - 102" OR 8' 6'' HIGH AND 216" OR 18' LONG. |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Largo, FL |
| Date: 05/07/2012 |
| Is this an emergency?: No |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame |
| Items Requiring Repair: Broken latch |
| Type of Window: Double-hung (both halves open) |
| Window Frame Material: Wood |
| Comment: i need strings in windows repaired and latches replace |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Largo, FL |
| Date: 02/17/2012 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Emergency Service |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame & Glass |
| Items Requiring Repair: Water damage around frame |
| Window Frame Material: Aluminum |
| Comment: live in a mobile home water damage on the windows had roof leaking and need to have all the windows replaced in the home |
|
|
|
| Project Name: Install Carpentry Framing |
| Project Location: Largo, FL |
| Date: 01/24/2012 |
| Project drawings: Yes |
| Framing Material: Metal framing |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Framing for a single family home being built. Breaking ground in a month and have plans for bids on metal framing. |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Largo, FL |
| Date: 01/14/2012 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame & Glass |
| Items Requiring Repair: Install New Glass |
| Type of Window: Casement |
| Window Frame Material: Aluminum |
| Comment: Replace broken glass in an awning window; window has an aluminum frame |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Largo, FL |
| Date: 01/04/2012 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame |
| Items Requiring Repair: Crank Malfunction |
| Window Frame Material: Aluminum |
| Comment: Two windows have cranks that do not function well. |
|
|
|
| Project Name: Install Drywall |
| Project Location: Largo, FL |
| Date: 10/12/2011 |
| Rooms for Drywall Installation: Bedroom(s) |
| Kind of Project: Standard drywall installation (hang, tape, sand, and texture) |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: drywall installation,popcorn removal,trim,painting |
|
|
|
| Project Name: Repair Carpentry Framing |
| Project Location: Largo, FL |
| Date: 10/06/2011 |
| Framing to be Repaired: Other |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: side garage door is not sealed correctly and water is coming into the garage when it rains |
|
|
|
| Project Name: Build a New Closet |
| Project Location: Largo, FL |
| Date: 10/04/2011 |
| Closet Features: Built-in shelves |
| Closet Features: Closet rod for hanging clothes |
| Closet Features: Lighting |
| Location of Closet: Master Bedroom |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Part of a larger home remodel?: Yes |
| Property Owner: Yes |
| Comment: We are doing some fixing up in a manufactured home where we live. |
|
|
|
| Project Name: Install Interior Trim and Decorative Moldings |
| Project Location: Largo, FL |
| Date: 09/23/2011 |
| Features that Need Finish Work: Door casing |
| Features that Need Finish Work: Window casing |
| Doors & Windows to be Installed: None |
| Number of Rooms: NA |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Comment: need three windows trimmed and two doors trimmed |
|