|
|
| Project Name: Install or Replace Wood Stairs and Railings |
| Project Location: Harvest, AL |
| Date: 01/20/2012 |
| Stair Construction: Open on two sides (railings on both sides) |
| Type of Stairs: Interior stained |
| Type of Stairs: Landing mid-stair |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: We are remodeling a home in which the staircases were not up to code. They have been ripped down already. We want railings and wood stairs. |
|
|
|
| Project Name: Repair Interior Trim and Decorative Moldings |
| Project Location: Harvest, AL |
| Date: 01/06/2012 |
| Repairs Needed: Several small interior finish carpentry repair projects |
| What kind of location is this?: Home/Residence |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Need wood laminate flooring installed - no glue - for several rooms to replace the carpet |
|
|
|
| Project Name: Repair Interior Trim and Decorative Moldings |
| Project Location: Harvest, AL |
| Date: 12/07/2011 |
| Reasons for Damage: Other |
| Repairs Needed: Ceiling molding (picture and crown) |
| Repairs Needed: Door casing |
| Repairs Needed: Wall molding (paneling, wainscoting, and chair rail) |
| What kind of location is this?: Home/Residence |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Purchaesd home want crown put in living/dining area, bead board in dining and 2 doors cased in. <br /> |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Harvest, AL |
| Date: 07/20/2011 |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame |
| Comment: I would like the trim around the window to be repaired. The trim is soft. |
|
|
|
| Project Name: Repair Carpentry Framing |
| Project Location: Harvest, AL |
| Date: 04/14/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: repair back door and frame. |
|
|
|
| Project Name: Install or Replace Exterior Window Shutters |
| Project Location: Harvest, AL |
| Date: 04/05/2011 |
| Window Size: Other |
| Material and Finish: Other |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: looking for est on sutter install. vinyl non-paint whit- |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Harvest, AL |
| Date: 12/19/2010 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame |
| Items Requiring Repair: Deteriorated wood |
| Type of Window: Fixed (non-opening picture window) |
| Window Frame Material: Wood |
| Comment: large stained glass fixed window in bathroom. wood has deteriorated and we need a new frame. do not want a new window installed. frame has to be customer made (I guess) |
|
|
|
| Project Name: Build a New Closet |
| Project Location: Harvest, AL |
| Date: 09/10/2010 |
| Closet Features: Built-in shelves |
| Closet Features: Closet rod for hanging clothes |
| Closet Features: Lighting |
| Location of Closet: Master Bedroom |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Part of a larger home remodel?: No |
| Property Owner: Yes |
| Comment: Master bedroom closet shelve replacement. We have replaced the metal white racks twice but they do not seem to hold. We are looking for hanging rails for a male and female, sweater cubbies, and possible shoe cubbies with lighting (optional). The measurements are 12' by 5'5" |
|
|
|
| Project Name: Install Interior Trim and Decorative Moldings |
| Project Location: Harvest, AL |
| Date: 08/15/2010 |
| Comment: Would like wainscoting in dining room, crown moulding in living areas and install two interior doors. |
|
|
|
| Project Name: Install or Replace Exterior Window Shutters |
| Project Location: Harvest, AL |
| Date: 07/15/2010 |
| Window Size: Other |
| Material and Finish: Other |
| Match Existing Shutters: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: I want to replace all my exterior window shutters but I don't have the new ones purchased yet. It will be for 7 windows = 14 shutters. |
|