|
|
| Project Name: Repair or Restore Exterior Window Shutters |
| Project Location: Florissant, MO |
| Date: 05/17/2012 |
| ShuttersOperable or Fixed: Operable |
| Problem: Other |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: need to know if my exterior shuttler need to be replace or painted |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Florissant, MO |
| Date: 05/17/2012 |
| Is this an emergency?: Yes |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame & Glass |
| Items Requiring Repair: Water leaking around glass |
| Items Requiring Repair: Moisture between panes of glass |
| Items Requiring Repair: Broken latch |
| Items Requiring Repair: Need Screens |
| Items Requiring Repair: Water damage around frame |
| Type of Window: Double-hung (both halves open) |
| Window Frame Material: Vinyl |
| Comment: Replace all windows. need bid immediately, today if possible |
|
|
|
| Project Name: Repair Wood Stairs and Railings |
| Project Location: Florissant, MO |
| Date: 05/12/2012 |
| Kind of stairs: Interior |
| Problem(s): New railing needed |
| What kind of location is this?: Home/Residence |
| Is this an emergency?: No |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: THE HAND RAIL LEADING TO THE BASEMENT IS BROKEN IN TWO PLACES. |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Florissant, MO |
| Date: 05/10/2012 |
| Is this an emergency?: No |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Repair Required: Frame |
| Items Requiring Repair: Water leaking around glass |
| Type of Window: Double-hung (both halves open) |
| Window Frame Material: Vinyl |
| Comment: we have two windows that have lost its gas and seal and they now have water in them |
|
|
|
| Project Name: Install Interior Trim and Decorative Moldings |
| Project Location: Florissant, MO |
| Date: 05/09/2012 |
| Features that Need Finish Work: Crown molding |
| Features that Need Finish Work: Wall molding - paneling, wainscoting and chair rail |
| Doors & Windows to be Installed: Windows |
| Need Finish Carpeter/Woodworker: Don't Know |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Kitchen island updated and patio window replaced with regular windows. |
|
|
|
| Project Name: Install Carpentry Framing |
| Project Location: Florissant, MO |
| Date: 04/22/2012 |
| Project drawings: No |
| Framing Material: Don't Know |
| Framing Needs: Interior framing for remodel project |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: 4 BEDROOM PLUS REC AREA FOR BASEMENT FRAMING |
|
|
|
| Project Name: Repair Wood Stairs and Railings |
| Project Location: Florissant, MO |
| Date: 04/16/2012 |
| What kind of location is this?: Home/Residence |
| Is this an emergency?: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: Looking for someone to repair wooden stairs |
|
|
|
| Project Name: Install or Replace Wood Stairs and Railings |
| Project Location: Florissant, MO |
| Date: 04/07/2012 |
| Stair Construction: Other |
| Type of Stairs: Straight |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Purchased and stained steps. Pulled up carpet and cleaned staircase. Need somebody to put them in. First four steps are open with railings on both sides. Railings have been taken down as well. The rest of the staircase is closed. |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Florissant, MO |
| Date: 04/06/2012 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame |
| Items Requiring Repair: Broken latch |
| Type of Window: Double-hung (both halves open) |
| Window Frame Material: Wood |
| Comment: Its fun and easy placing glass in windows. |
|
|
|
| Project Name: Repair Carpentry Framing |
| Project Location: Florissant, MO |
| Date: 03/26/2012 |
| Framing to be Repaired: Non-bearing interior walls |
| Framing to be Repaired: Other |
| Dry Rot or Water Damage: Don't Know |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: A decorative ceiling beam is pulling away from ceiling--not load bearing and of box construction. |
|