|
|
| Project Name: Install or Replace Wood Stairs and Railings |
| Project Location: Fairborn, OH |
| Date: 05/15/2012 |
| Stair Construction: Other |
| Type of Stairs: Exterior |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: I currently have a handrail on one side of the steps, but need to have a rail installed on the other side.. |
|
|
|
| Project Name: Repair Structural Problems with Steel Beams |
| Project Location: Fairborn, OH |
| Date: 10/17/2011 |
| What Beam Supports: Roof structure only |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Comment: I'm trying to connect two rooms together. The wall between them which have 3 entrance doors is made of blocks. The aprox lenght is 30ft. I'm trying to open it up to a 12'-15' height. The higher the better. That wall has one I-Beam being supported on it. |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Fairborn, OH |
| Date: 08/08/2011 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Repair Required: Frame & Glass |
| Items Requiring Repair: Moisture between panes of glass |
| Items Requiring Repair: Crank Malfunction |
| Type of Window: Garden Window |
| Window Frame Material: Vinyl |
| Comment: Garden wondow crank not working, top glass pain looks like it has condensation, screen hangs down |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Fairborn, OH |
| Date: 07/14/2011 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame & Glass |
| Items Requiring Repair: Install New Glass |
| Window Frame Material: Vinyl |
| Comment: I am looking to get 13 windows replace in my home and sidding is vinlel i would like to have that replaced as while |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Fairborn, OH |
| Date: 06/09/2011 |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Type of Repair Required: Frame |
| Type of Window: Single-hung (lower half opens) |
| Comment: Tenants screwed drywall to window frame. This action has caused a split in part of the window's frame hampering normal operation of the window. |
|
|
|
| Project Name: Install or Replace Exterior Window Shutters |
| Project Location: Fairborn, OH |
| Date: 05/29/2011 |
| Window Size: Other |
| Material and Finish: Plastic |
| Match Existing Shutters: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Two windows in front with shutter on each side and picture window shutter on each side total of 6 14 wide 43 long |
|
|
|
| Project Name: Install Interior Trim and Decorative Moldings |
| Project Location: Fairborn, OH |
| Date: 02/21/2011 |
| Comment: Will need sides of stairwell trimmed out after carpet is installed. |
|
|
|
| Project Name: Install Carpentry Framing |
| Project Location: Fairborn, OH |
| Date: 09/06/2010 |
| Project drawings: No |
| Framing Material: Wood framing |
| Framing Needs: Interior framing for remodel project |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: i removed and shower insert and would like the area framed in and shower basin poured so i can do the backer board and tile |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Fairborn, OH |
| Date: 05/14/2010 |
| Nature of Project: Repair Window Frame |
| Number of Windows: 6 - 9 |
| Interested in Green Alternatives: No |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Storm windows keep coming off of track at father-in-laws windows. No idea what kind they are. |
|
|
|
| Project Name: Install Carpentry Framing |
| Project Location: Fairborn, OH |
| Date: 04/23/2010 |
| Project drawings: No |
| Framing Material: Wood framing |
| Consumer Owns Home: No |
| Framing Needs: Other |
| Interested in Green Alternatives: No |
| Request is for Commercial Location: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Comment: 1.Installfram and door in room <br />2. Replace storm door |
|