|
|
| Project Name: Install or Replace Wood Stairs and Railings |
| Project Location: Cheyenne, WY |
| Date: 10/05/2011 |
| Stair Construction: Open on two sides (railings on both sides) |
| Type of Stairs: Curved |
| Type of Stairs: Interior painted |
| Type of Stairs: Landing mid-stair |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Remove and replace stairs going from ground level to basement |
|
|
|
| Project Name: Build a Custom Arbor, Pergola or Trellis - For Business |
| Project Location: Cheyenne, WY |
| Date: 07/07/2011 |
| Project Type: New addition for new landscape design |
| Design Preparation: Sketches and/or basic idea of project |
| What kind of location is this?: Business |
| Timing: Timing is flexible |
| Type of Business: Government/Municipality |
| For how many locations/units is this request?: 1 |
| On-going: No |
| Type of Structure: Arbor |
| Material Desired: Want recommendation |
| Comment: Heavy duty park sign for local Cheyenne park. The kink you see in many state parks with plexiglass, maps, shingled roof, etc. Have pics as samples. |
|
|
|
| Project Name: Install or Replace Wood Stairs and Railings |
| Project Location: Cheyenne, WY |
| Date: 02/19/2011 |
| Stair Construction: Other |
| Type of Stairs: Landing mid-stair |
| Type of Stairs: Straight |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Replace with wood.Railing along upper stair, hand rail on stair, railing along stair mainfloor...remove wroght iron railing. |
|
|
|
| Project Name: Install or Replace Wood Stairs and Railings |
| Project Location: Cheyenne, WY |
| Date: 02/19/2011 |
| Stair Construction: Other |
| Type of Stairs: Exterior |
| Type of Stairs: Other |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Need contractor to replace 104"(l) x 40"(h) iron stair guard with wooden one that matches wooden decor of the house trim. Needs to be extreemely sturdy. |
|
|
|
| Project Name: Install or Replace Wood Stairs and Railings |
| Project Location: Cheyenne, WY |
| Date: 02/07/2011 |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: I would like to have an estimate for having wood a wrought iron railing replaced with a wood railing |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Cheyenne, WY |
| Date: 01/15/2011 |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Type of Repair Required: Frame & Glass |
| Items Requiring Repair: Window Sticks |
| Items Requiring Repair: Water damage around frame |
| Items Requiring Repair: Deteriorated wood |
|
|
|
| Project Name: Install or Replace Wood Stairs and Railings |
| Project Location: Cheyenne, WY |
| Date: 06/13/2010 |
| Stair Construction: Open on one side (railing on one side, wall on the other) |
| Type of Stairs: Interior covered with carpet |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: wood, 1 rail, 6 feet |
|
|
|
| Project Name: Install Carpentry Framing |
| Project Location: Cheyenne, WY |
| Date: 05/28/2010 |
| Project drawings: No |
| Framing Material: Wood framing |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Consumer Need: Quotes: Looking for quotes on this project |
| Comment: Shower to replace with a tub,need wall installed. |
|
|
|
| Project Name: Build a New Closet |
| Project Location: Cheyenne, WY |
| Date: 04/20/2010 |
| Consumer Owns Home: Yes |
| Closet Features: Built-in shelves |
| Closet Features: Closet rod for hanging clothes |
| Closet Features: Lighting |
| Location of Closet: Bedroom |
| Request is for Commercial Location: No |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Part of a larger home remodel?: No |
| Comment: Home built 1930's; closet in 1st bedroom and closet in 2nd bedroom share common rear wall. Would like to take down rear wall to expand closet for 1st bedroom, close off entrance in 2nd bedroom, add lighting and closet organizer. |
|