|
|
| Project Name: Install or Replace Wood Stairs and Railings |
| Project Location: Chapin, SC |
| Date: 08/29/2011 |
| Comment: I need a quote for i need stairs build from the garage to the home |
|
|
|
| Project Name: Repair Interior Trim and Decorative Moldings |
| Project Location: Chapin, SC |
| Date: 05/21/2011 |
| Repairs Needed: Wall molding (paneling, wainscoting, and chair rail) |
| What kind of location is this?: Home/Residence |
| Looking For:: Quotes |
| Contact Preference:: Arrange to meet and look at project |
|
|
|
| Project Name: Install or Replace Wood Stairs and Railings |
| Project Location: Chapin, SC |
| Date: 03/02/2011 |
| Stair Construction: Open on one side (railing on one side, wall on the other) |
| Type of Stairs: Straight |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: I need to install a rail in my house. I would prefer Iron. |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Chapin, SC |
| Date: 07/23/2010 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame |
| Items Requiring Repair: Deteriorated wood |
| Type of Window: Double-hung (both halves open) |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Chapin, SC |
| Date: 06/06/2010 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Repair Required: Frame |
| Items Requiring Repair: Crank Malfunction |
| Items Requiring Repair: Need Screens |
| Type of Window: Double-hung (both halves open) |
| Window Frame Material: Aluminum |
| Comment: Window frames are hard to remove for cleaning. Frames are drafty and the screens do not fit right. |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Chapin, SC |
| Date: 03/22/2010 |
| After Business Hours: Yes |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame |
| Comment: Home is under contract for sale. Closing is scheduled for March 30th. The pivot posts and window balancer mechanisms (tilt feature) have detached at the bottom sashes on 5 windows. Called for in home inspection. Windows are Peachtree brand. |
|
|
|
| Project Name: Build a Custom Arbor, Pergola or Trellis |
| Project Location: Chapin, SC |
| Date: 03/09/2010 |
| Project Type: New structure for covering deck, patio, walkway, etc. |
| Consumer Owns Home: Yes |
| Design Preparation: None |
| Request is for Commercial Location: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Structure: Pergola |
| Material Desired: Cedar |
| Comment: build pegola |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Chapin, SC |
| Date: 02/01/2010 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame & Glass |
| Items Requiring Repair: Install New Glass |
| Type of Window: Sliding Glass Door |
| Type of Window: Double-hung (both halves open) |
| Window Frame Material: Wood |
| Comment: Window replacement and sliding glass door replaced <br /> |
|
|
|
| Project Name: Install Carpentry Framing |
| Project Location: Chapin, SC |
| Date: 01/13/2010 |
| Project drawings: Yes |
| Framing Material: Wood framing |
| Consumer Owns Home: Yes |
| Framing Needs: Addition onto an existing home |
| Interested in Green Alternatives: No |
| Request is for Commercial Location: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Comment: doing a 750 sq ft addition onto existing home. inlaw suite. living room, bath, kitchenette, bedroom, screened porch, deck. deck and screened porch are additional sq. footage. |
|