|
| Project Name: Install Interior Trim and Decorative Moldings |
| Project Location: Champaign, IL |
| Date: 05/26/2012 |
| Features that Need Finish Work: Crown molding |
| Features that Need Finish Work: Door casing |
| Features that Need Finish Work: Floor molding |
| Features that Need Finish Work: Window casing |
| Number of Rooms: 4 or more |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
|
|
| Project Name: Repair Carpentry Framing |
| Project Location: Champaign, IL |
| Date: 05/24/2012 |
| Framing to be Repaired: Non-bearing interior walls |
| Dry Rot or Water Damage: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Comment: We have an entry area between the kitchen and dining room and we would like to widen it and create an arch. We already have the floors being replaced on June 11th so we need to move fast. |
|
|
|
| Project Name: Install Interior Trim and Decorative Moldings |
| Project Location: Champaign, IL |
| Date: 05/08/2012 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: interior trim and doors need installed -crown molding and baseboards |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Champaign, IL |
| Date: 01/20/2012 |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Type of Repair Required: Frame & Glass |
|
|
|
| Project Name: Install Carpentry Framing |
| Project Location: Champaign, IL |
| Date: 10/11/2011 |
| Project drawings: No |
| Framing Material: Wood framing |
| Framing Needs: Interior framing for remodel project |
| Interested in Green Alternatives: No |
| What kind of location is this?: Business |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Floor jiose need to be raised 16 inches from basement to allow 7 foot 6 inch basement cieling for city code. The floor is 54 foot by 16 foot. |
|
|
|
| Project Name: Repair Interior Trim and Decorative Moldings |
| Project Location: Champaign, IL |
| Date: 08/23/2011 |
| Reasons for Damage: Other |
| Repairs Needed: Other |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Comment: repair or replace picture window sill - edge damaged due to dog chewing on it |
|
|
|
| Project Name: Build a New Closet |
| Project Location: Champaign, IL |
| Date: 05/07/2011 |
| Closet Features: Built-in shelves |
| Closet Features: Closet rod for hanging clothes |
| Location of Closet: Bedroom |
| Location of Closet: Master Bedroom |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Part of a larger home remodel?: No |
| Property Owner: Yes |
| Comment: Space is soooooooooooooo needed! Shoes for days and clothes everywhere..my closet needs a make over..and has needed it before I remodeled the kitchen! |
|
|
|
| Project Name: Install Interior Trim and Decorative Moldings |
| Project Location: Champaign, IL |
| Date: 02/28/2011 |
| Comment: wood work around window. |
|
|
|
| Project Name: Install Carpentry Framing |
| Project Location: Champaign, IL |
| Date: 12/08/2010 |
| Project drawings: Yes |
| Framing Material: Metal framing |
| Interested in Green Alternatives: No |
| What kind of location is this?: Business |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Commercial location,1,499 sq ft renovation, bid date,12-15-10. |
|
|
|
| Project Name: Install or Replace Wood Stairs and Railings |
| Project Location: Champaign, IL |
| Date: 08/12/2010 |
| Stair Construction: Other |
| Type of Stairs: Interior stained |
| Type of Stairs: Straight |
| What kind of location is this?: Home/Residence |
| What best describes your need?: Quotes: Looking for quotes on this project |
| Historical Work: No |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Timing: I'm flexible |
| When:: 1 to 2 Weeks |
| Timing Preference:: Anytime |
| Comment: Purchasing a new home which is at the drywall stage- primed and painted. Handrails have yet to be installed. |
|