|
|
| Project Name: Repair Window Frames |
| Project Location: Aliquippa, PA |
| Date: 09/25/2011 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame |
| Items Requiring Repair: Moisture between panes of glass |
| Type of Window: Double-hung (both halves open) |
| Window Frame Material: Vinyl |
| Comment: window not closing...kithen window foggy |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Aliquippa, PA |
| Date: 08/10/2011 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Repair Required: Frame |
| Items Requiring Repair: Water damage around frame |
| Type of Window: Bay |
| Window Frame Material: Aluminum |
| Comment: I have had leaking around my bay windows that I would to have looked at by a professional. |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Aliquippa, PA |
| Date: 08/04/2011 |
| Nature of Project: Repair Window Frame |
| Number of Windows: 2 |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Comment: Need someone to replace 2 large sash sections of 2 bay windows made by pella |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Aliquippa, PA |
| Date: 06/23/2011 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame |
| Items Requiring Repair: Crank Malfunction |
| Type of Window: Casement |
| Window Frame Material: Wood |
| Comment: my anderson casement windows cranks need replaced I need 3 right handed 3 left handed |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Aliquippa, PA |
| Date: 04/15/2011 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame |
| Items Requiring Repair: Window Sticks |
| Items Requiring Repair: Window is jammed |
| Type of Window: Double-hung (both halves open) |
| Window Frame Material: Aluminum |
| Comment: im having a problem with some of my peachtree windows, they were installed in 1993 when my house was built, it think I need new stringers???? |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Aliquippa, PA |
| Date: 03/27/2011 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame |
| Items Requiring Repair: Block and tackle (pulley) |
| Type of Window: Double-hung (both halves open) |
| Window Frame Material: Aluminum |
| Comment: broken stringers on peachtree windows |
|
|
|
| Project Name: Build a Custom Arbor, Pergola or Trellis |
| Project Location: Aliquippa, PA |
| Date: 02/23/2011 |
| Project Type: New addition for new landscape design |
| Design Preparation: None |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Type of Structure: Pergola |
| Material Desired: Synthetic/Composite material |
| Property Owner: Yes |
|
|
|
| Project Name: Build a Custom Arbor, Pergola or Trellis |
| Project Location: Aliquippa, PA |
| Date: 02/21/2011 |
| Project Type: New structure for covering deck, patio, walkway, etc. |
| Design Preparation: None |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Type of Structure: Pergola |
| Material Desired: Synthetic/Composite material |
| Property Owner: Yes |
| Comment: back patio <br /> |
|
|
|
| Project Name: Repair Window Frames |
| Project Location: Aliquippa, PA |
| Date: 02/14/2011 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Type of Repair Required: Frame |
| Items Requiring Repair: Glass is loose |
| Items Requiring Repair: Deteriorated wood |
| Type of Window: Fixed (non-opening picture window) |
| Window Frame Material: Wood |
| Comment: FRAME HAS ROTTED AND GLASS HAS SLIPPED DOWN - LOTS OF COLD AIR COMING IN - EITHER NEED FIXED OR REPLACED |
|
|
|
| Project Name: Repair Carpentry Framing |
| Project Location: Aliquippa, PA |
| Date: 09/21/2010 |
| Framing to be Repaired: Non-bearing interior walls |
| Dry Rot or Water Damage: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: removal of a interior wall between kitchen & dining area. |
|