|
|
| Project Name: Survey Property |
| Project Location: Taylors, SC |
| Date: 05/02/2012 |
| Survey Purpose: Other |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
|
|
|
| Project Name: Draftsperson or CADD Expert (Non-Designer) |
| Project Location: Taylors, SC |
| Date: 04/27/2012 |
| Type of Project: Home remodel |
| Design Preparation: Blueprints that need alteration |
| Neighborhood covenants: Don't Know |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: have a outdoor pool that is already installed, but will need to enclose the entire area. the pool is 12x53 and it's a salt water pool. I am remodeling the upstairs to customers requests and am coming off the outside of the house and doing a gable etc. You must be able to give me drawings that are to be build from after rough demensions are given |
|
|
|
| Project Name: Survey Property |
| Project Location: Taylors, SC |
| Date: 01/11/2012 |
| Survey Purpose: Plot survey (subdivision/boundary alteration plots) |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: Need a survey of a lot I am going to purchase in a subdivision. 3/4 acre mild terrain 5 sided lot. |
|
|
|
| Project Name: Analyze a Structural Issue (Structural Engineer) |
| Project Location: Taylors, SC |
| Date: 01/06/2012 |
| Architectural drawings: Yes |
| Need for Engineer: Sizing of interior supports |
| Wall Construction Type: Metal frame |
| Type of Engineer: Structural |
| What kind of location is this?: Business |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: My have a Buttler Type building. Need structural framing for RTU's x 4 or 5. Need to have the design work for next week. |
|
|
|
| Project Name: Survey Property |
| Project Location: Taylors, SC |
| Date: 12/30/2011 |
| Survey Purpose: Plot survey (subdivision/boundary alteration plots) |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
|
|
|
| Project Name: Survey Property |
| Project Location: Taylors, SC |
| Date: 06/03/2011 |
| Survey Purpose: Plot survey (subdivision/boundary alteration plots) |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Comment: marking boundry lines |
|
|
|
| Project Name: Hire an Architect to Design a Project |
| Project Location: Taylors, SC |
| Date: 05/03/2011 |
| Project Type: Complete remodel (with or without addition) |
| Building Type: House |
| Needs: Design drawings |
| Needs: Assist with selection of general contractor |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Comment: Update existing home add master bedroom, bath and garage |
|
|
|
| Project Name: Analyze a Structural Issue (Structural Engineer) |
| Project Location: Taylors, SC |
| Date: 08/12/2010 |
| Type of Project: New home |
| Type of Engineer: Structural |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Ready to Hire |
| Comment: I require a professional evaluation of the structural condition of my house |
|
|
|
| Project Name: Survey Property |
| Project Location: Taylors, SC |
| Date: 04/16/2010 |
| Survey Purpose: Boundary survey (American Land Title Association) |
| Request is for Commercial Location: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Comment: I am trying to put a fence on my property, but it appears my neighbors fence is on my property |
|
|
|
| Project Name: Survey Property |
| Project Location: Taylors, SC |
| Date: 04/06/2010 |
| Survey Purpose: Boundary survey (American Land Title Association) |
| Request is for Commercial Location: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
|