|
|
| Project Name: Draftsperson or CADD Expert (Non-Designer) |
| Project Location: Simpsonville, SC |
| Date: 05/16/2012 |
| Type of Project: Home remodel |
| Design Preparation: Sketches |
| Neighborhood covenants: No |
| Other Issues: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
|
|
|
| Project Name: Survey Property |
| Project Location: Simpsonville, SC |
| Date: 04/26/2012 |
| Survey Purpose: Boundary survey (American Land Title Association) |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Comment: Need to build a fence and find out where the property line is so I don't build it in my neigbors yard. |
|
|
|
| Project Name: Survey Property |
| Project Location: Simpsonville, SC |
| Date: 04/16/2012 |
| Survey Purpose: Boundary survey (American Land Title Association) |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Comment: selling our rental property and the county survey is vague to property lines |
|
|
|
| Project Name: Survey Property |
| Project Location: Simpsonville, SC |
| Date: 04/01/2012 |
| Survey Purpose: Boundary survey (American Land Title Association) |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Comment: Fencing |
|
|
|
| Project Name: Survey Property |
| Project Location: Simpsonville, SC |
| Date: 03/30/2012 |
| Survey Purpose: Boundary survey (American Land Title Association) |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Comment: Determine boundary between existing iron pipes at ends of 1600 straight line border. |
|
|
|
| Project Name: Survey Property |
| Project Location: Simpsonville, SC |
| Date: 02/29/2012 |
| Comment: I wanted an estimate for getting a flood survey done. |
|
|
|
| Project Name: Survey Property |
| Project Location: Simpsonville, SC |
| Date: 02/23/2012 |
| Survey Purpose: Boundary survey (American Land Title Association) |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Comment: purchased property 2 years ago and want to put up privacy fence and think that fence behind me is on my property and is over the right of way after my property ends |
|
|
|
| Project Name: Survey Property |
| Project Location: Simpsonville, SC |
| Date: 12/22/2011 |
| Survey Purpose: Plot survey (subdivision/boundary alteration plots) |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Comment: Planning adding outbuildings on lot and need lot lines located so that set backs are properly done. 6 contiguous pins cover the areas involved. |
|
|
|
| Project Name: Analyze a Structural Issue (Structural Engineer) |
| Project Location: Simpsonville, SC |
| Date: 10/12/2011 |
| Architectural drawings: Yes |
| Need for Engineer: Concrete foundation specifications |
| Need for Engineer: Design appropriate structural repair(s) |
| Need for Engineer: Inspect repairs during and after work |
| Need for Engineer: Test structures to withstand natural forces, including earthquakes, water, wind, and snow |
| Wall Construction Type: Framing not involved in project |
| Type of Project: New home |
| Type of Engineer: Structural |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: I'm having a house built. The house is in the pre-drywall stage. I noticed a crack in the concrete slab foundation that concerns me, and I want to have it cleared by a structural engineer. The crack extends the entire length of the house, though not very wide more like a hair line crack. I would like an estimate on what it will cost to have an engineer inspect this issue. |
|
|
|
| Project Name: Draftsperson or CADD Expert (Non-Designer) |
| Project Location: Simpsonville, SC |
| Date: 10/04/2011 |
| Type of Project: Other |
| Design Preparation: Sketches |
| Neighborhood covenants: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Ready to Hire |
| Comment: 42'x42' barn (will include a bathroom, septic, other minor plumbing, heat/cool, electrical. |
|