|
|
| Project Name: Survey Property |
| Project Location: Raleigh, NC |
| Date: 05/18/2012 |
| Survey Purpose: Boundary survey (American Land Title Association) |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
|
|
|
| Project Name: Survey Property |
| Project Location: Raleigh, NC |
| Date: 05/16/2012 |
| Survey Purpose: Boundary survey (American Land Title Association) |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: survey needed for upcoming closing |
|
|
|
| Project Name: Survey Property |
| Project Location: Raleigh, NC |
| Date: 05/14/2012 |
| Survey Purpose: Boundary survey (American Land Title Association) |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Comment: Installing a fence in backyard |
|
|
|
| Project Name: Survey Property |
| Project Location: Raleigh, NC |
| Date: 05/11/2012 |
| Survey Purpose: Boundary survey (American Land Title Association) |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: THERE IS A 5 ACRE PIECE OF LAND...I WANT TO BUY PART OF IT...BOUNBRIES ARE EXISTING AND LAND IS CLEAR |
|
|
|
| Project Name: Analyze a Structural Issue (Structural Engineer) |
| Project Location: Raleigh, NC |
| Date: 05/09/2012 |
| Architectural drawings: No |
| Need for Engineer: Test structures to withstand natural forces, including earthquakes, water, wind, and snow |
| Wall Construction Type: Wood frame |
| Type of Project: Structural repair on existing structure |
| Type of Engineer: Structural |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Condominium with mold in outside wall below windows due to water entering from outside. Condo Assn is responsible for outside repair. I need opinion what must be done to effectively correct water problem so I can ensure condo association meets those requirements. I need opinion NOW. I am in destructed phase of kitchen remodel and can't proceed until I get an opinion on needed remediation, and determine whether interior construction can proceed before outside remediation is completed. So, this would be a consultation, one you are willing to document and stand behind. |
|
|
|
| Project Name: Analyze a Structural Issue (Structural Engineer) |
| Project Location: Raleigh, NC |
| Date: 05/05/2012 |
| Architectural drawings: No |
| Need for Engineer: Concrete foundation specifications |
| Wall Construction Type: Don't Know |
| Type of Project: Structural repair on existing structure |
| Type of Engineer: Structural |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: I'm under contract for a home and the home inspection revealed a crack in the foundation. I need a structural engineer to evaluate the problem and advise on a solution. |
|
|
|
| Project Name: Survey Property |
| Project Location: Raleigh, NC |
| Date: 05/04/2012 |
| Survey Purpose: Boundary survey (American Land Title Association) |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Comment: Buying a home |
|
|
|
| Project Name: Survey Property |
| Project Location: Raleigh, NC |
| Date: 05/03/2012 |
| Survey Purpose: Boundary survey (American Land Title Association) |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Comment: determine property line |
|
|
|
| Project Name: Survey Property |
| Project Location: Raleigh, NC |
| Date: 04/20/2012 |
| Survey Purpose: Boundary survey (American Land Title Association) |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: i want to put up a fence in the back yard |
|
|
|
| Project Name: Survey Property |
| Project Location: Raleigh, NC |
| Date: 04/20/2012 |
| Survey Purpose: Boundary survey (American Land Title Association) |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
|