|
|
| Project Name: Survey Property |
| Project Location: Chapel Hill, NC |
| Date: 05/10/2012 |
| Survey Purpose: Topographic or site map survey |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: surveying an easement line to put in a sewer line. This is URGENT, needs to be done in a few days |
|
|
|
| Project Name: Survey Property |
| Project Location: Chapel Hill, NC |
| Date: 05/06/2012 |
| Survey Purpose: Boundary survey (American Land Title Association) |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Comment: Survey property lines |
|
|
|
| Project Name: Hire an Architect to Design a Project |
| Project Location: Chapel Hill, NC |
| Date: 03/26/2012 |
| Project Type: Interior remodel of a few rooms |
| Building Type: House |
| Needs: Design drawings |
| Needs: Project evaluation |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Comment: Recently had a house fire that will require significant repairs. Looking to make changes and open up a 1986 colonial--specifically in foyer/kitchen and master bath/closet area. |
|
|
|
| Project Name: Analyze a Structural Issue (Structural Engineer) |
| Project Location: Chapel Hill, NC |
| Date: 03/15/2012 |
| Comment: I need a structural engineer. I have a report I need reviewed for structural issues. |
|
|
|
| Project Name: Analyze a Structural Issue (Structural Engineer) |
| Project Location: Chapel Hill, NC |
| Date: 03/15/2012 |
| Comment: I wanted to see if Jeff could assess a foundation issue I have. I live in the middle of Chapel hill, Pittsburo. |
|
|
|
| Project Name: Hire an Architect to Design a Project |
| Project Location: Chapel Hill, NC |
| Date: 03/01/2012 |
| Project Type: Interior remodel of a few rooms |
| Building Type: Residential outbuilding (garage, etc) |
| Needs: Project evaluation |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
|
|
|
| Project Name: Hire an Architect to Design a Project |
| Project Location: Chapel Hill, NC |
| Date: 02/16/2012 |
| Project Type: Addition (one story) |
| Building Type: House |
| Needs: Design drawings |
| Needs: Technical construction documents |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Comment: Attached garage and utility room. |
|
|
|
| Project Name: Hire an Architect to Design a Project |
| Project Location: Chapel Hill, NC |
| Date: 02/03/2012 |
| Project Type: New structure |
| Building Type: House |
| Needs: Design drawings |
| Approx. Budget (Fees + Construction): $500,001-$1,000,000 |
| Approx. Square footage: Over 3000 square feet |
| Historical Work: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: No |
|
|
|
| Project Name: Survey Property |
| Project Location: Chapel Hill, NC |
| Date: 01/31/2012 |
| Survey Purpose: Boundary survey (American Land Title Association) |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Comment: Need only the boundary location identification (flag on the corners) |
|
|
|
| Project Name: Analyze a Structural Issue (Structural Engineer) |
| Project Location: Chapel Hill, NC |
| Date: 01/22/2012 |
| Architectural drawings: No |
| Need for Engineer: Concrete foundation specifications |
| Need for Engineer: Design appropriate structural repair(s) |
| Wall Construction Type: Framing not involved in project |
| Type of Project: Structural repair on existing structure |
| Type of Engineer: Structural |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: I want to buy a home that has cracks in the foundation. I want someone to tell me how serious it is and prospects for future in terms of whether it will lead to structural damage and also advise on repairs to prevent future damage |
|