|
|
| Project Name: Repair or Service a Central Humidifier |
| Project Location: Arnold, MO |
| Date: 08/18/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: I need an estimate to install or maybe repair a unit in my sunroom. I don't know what was previously used to heat or cool the room, if it can be repaired awesome, if not I could install something or replace the existing unit. Forced air/ heating or something comparable |
|
|
|
| Project Name: Install a Central Air Conditioning System |
| Project Location: Arnold, MO |
| Date: 08/17/2011 |
| What is the nature of this project?: Install or replace central air conditioning system |
| Select the type of heating system(s) you are currently using. (Check all that apply): Electric fired forced air (central heating) |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: central air unit compressor blew up in the house we just bought. currently without air |
|
|
|
| Project Name: Install a Window Air Conditioning Unit |
| Project Location: Arnold, MO |
| Date: 08/05/2011 |
| Installation location: In window opening |
| Nearby power: Yes |
| Materials Provided by Homeowner: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: I would like a window AC and Heater until installed in my sunroom. It has sliding doors all the way across the room. There are plenty of outlets in the sunroom as well as close connection to the utility room. |
|
|
|
| Project Name: Repair or Service a Central Air Conditioning System |
| Project Location: Arnold, MO |
| Date: 07/22/2011 |
| Problem description: Annual maintenance |
| Equipment Age: 11 - 15 years |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Need an estimate for annual maintenance and checkup for AC unit |
|
|
|
| Project Name: Install a Central Air Conditioning System |
| Project Location: Arnold, MO |
| Date: 07/18/2011 |
| What is the nature of this project?: Install or replace central air conditioning system |
| Select the type of heating system(s) you are currently using. (Check all that apply): Natural gas fired forced air (central heating) |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Furnace and A/C are 50 yrs old and have been having some problems with the A/C. Have had minor repairs and was advised that would be spending good money after bad. |
|
|
|
| Project Name: Repair or Service a Central Air Conditioning System |
| Project Location: Arnold, MO |
| Date: 07/18/2011 |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: air conditioning check |
|
|
|
| Project Name: Install a Central Air Conditioning System |
| Project Location: Arnold, MO |
| Date: 07/06/2011 |
| What is the nature of this project?: Install or replace central air conditioning system |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Consumer Need: Quotes: Looking for quotes on this project |
|
|
|
| Project Name: Install a Window Air Conditioning Unit |
| Project Location: Arnold, MO |
| Date: 07/04/2011 |
| What is the nature of this project?: Install or replace window air conditioning unit |
| Select the type of heating system(s) you are currently using. (Check all that apply): Electric fired forced air (central heating) |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: replace condenser |
|
|
|
| Project Name: Repair or Service a Central Air Conditioning System |
| Project Location: Arnold, MO |
| Date: 07/02/2011 |
| Problem description: Leaking |
| Problem description: Not enough cooling anywhere |
| Equipment Age: Don't Know |
| After Business Hours: Yes |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: had my central a/c unit charged recently, was told it was conpletely out of freon after the charge was cooling fine for a few days then the air started getting less cool and couldnt cool off the mobile home properly so need to see if the freon leaked out and see cost for repair vs just buying a new unit. |
|
|
|
| Project Name: Repair or Service a Central Air Conditioning System |
| Project Location: Arnold, MO |
| Date: 06/22/2011 |
| What is the nature of this project?: Repair or service central air conditioning system |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: we need a working ac unit |
|