|
|
| Project Name: Build an Addition |
| Project Location: Whiteland, IN |
| Date: 04/10/2012 |
| Interested in Green Alternatives: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Design and build |
| Rooms Included:: Bathroom |
| Rooms Included:: Bedroom(s) |
| Property Owner: Yes |
| Comment: i would like to add a master bedroom to an existing home with a master bath and walk in closet. the size would be somewhere around 20x30. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Whiteland, IN |
| Date: 04/07/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: Yes |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: shower repair. need to replace standing shower |
|
|
|
| Project Name: Renovate or Repair a Home |
| Project Location: Whiteland, IN |
| Date: 03/16/2012 |
| Type of Work: Doors and windows |
| Type of Work: Framing |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Project Description: Major home repair project |
| Project Type: Exterior |
| Property Owner: Yes |
| Comment: Wind damage, gutter and sofit damage and rear screen door damage that would need to be replaced |
|
|
|
| Project Name: Build an Addition |
| Project Location: Whiteland, IN |
| Date: 03/14/2012 |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Design and build |
| Rooms Included:: Deck/Porch |
| Property Owner: Yes |
| Comment: Expand concrete patio and add wood cover/roof over patio (not enclosed) |
|
|
|
| Project Name: Build an Addition |
| Project Location: Whiteland, IN |
| Date: 02/06/2012 |
| Interested in Green Alternatives: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Addition: Second story addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Design and build |
| Rooms Included:: Bathroom |
| Rooms Included:: Bedroom(s) |
| Rooms Included:: Laundry/Mud room |
| Property Owner: Yes |
| Comment: want to make up stairs a bedroom, bat, and laundry room with storage/closet |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Whiteland, IN |
| Date: 01/31/2012 |
| Floorplan: I am considering changes to kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: Yes - I plan to move or update some or all appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Lighting: Yes - I plan to update the lighting |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Kitchen remodel of a home built in 1995.9 |
|
|
|
| Project Name: Build an Addition |
| Project Location: Whiteland, IN |
| Date: 01/04/2012 |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Project Description: Design and build |
| Comment: We would like to remove an existing sunroom to make a large living room with a covered porch. |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Whiteland, IN |
| Date: 11/15/2011 |
| Project Description: Build a new sunroom or enclosed patio or porch |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Comment: Building a sunroom on my back porch. Its currently covered in brick and needs leveled before it can be built. I want lots of windows and 2 sliding doors. 1 on each side. |
|
|
|
| Project Name: Remodel a Basement |
| Project Location: Whiteland, IN |
| Date: 11/09/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
|
|
|
| Project Name: Remodel a Garage |
| Project Location: Whiteland, IN |
| Date: 10/27/2011 |
| Scope of Remodel: Completely remodel garage |
| Storage cabinets / shelving: No - I do not plan to add or update the cabinets / shelving |
| Insulation: Yes - I plan to add insulation |
| Flooring: Yes - I plan to update the flooring |
| Electrical: Yes - I plan to update the lighting or electrical fixtures |
| Interior walls or drywall: Yes - I plan to add or remove walls or drywall |
| What kind of location is this?: Home/Residence |
| Garage doors: No - I do not plan to update the garage doors |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Transforming a two car garage into a living room/family room space. |
|