|
|
| Project Name: Remodel a Bathroom |
| Project Location: Tooele, UT |
| Date: 05/13/2012 |
| Shower / Bath: No - I will keep the existing shower or bath as is |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Tooele, UT |
| Date: 05/10/2012 |
| Floorplan: I am considering changes to kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: No - I do not plan to move or update the appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Lighting: No - I do not plan to update the lighting |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: replace L-shaped counter / cupboards, move stove from middle island to a wall and move the fridge to an outside wall opening up the kitchen more. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Tooele, UT |
| Date: 04/20/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Replace the water pipes in the wall and the drain pipe, replace the tub and shower, tile the wall, up date the vanity, sink, and cabinet, repaint the walls and ceiling. |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Tooele, UT |
| Date: 04/17/2012 |
| Project Description: Build a new sunroom or enclosed patio or porch |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Tooele, UT |
| Date: 04/15/2012 |
| Project Description: Build a new sunroom or enclosed patio or porch |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Looking to build a three season or four season sun room.o |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Tooele, UT |
| Date: 04/12/2012 |
| Floorplan: I plan to maintain existing kitchen floorplan |
| Cabinets: No - I do not plan to move or update the cabinets |
| Appliances: No - I do not plan to move or update the appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Lighting: Yes - I plan to update the lighting |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: new flooring,countertop,backsplash,remove wallpaper,change lighting |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Tooele, UT |
| Date: 03/28/2012 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 1 - 2 months |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Tooele, UT |
| Date: 03/05/2012 |
| Floorplan: I am considering changes to kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: No - I do not plan to move or update the appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Lighting: No - I do not plan to update the lighting |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: kitchen cabinets, flooring, stair rail |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Tooele, UT |
| Date: 02/20/2012 |
| Project Description: Build a new sunroom or enclosed patio or porch |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: 30x15 sun room attached to my residence. |
|
|
|
| Project Name: Remodel a Basement |
| Project Location: Tooele, UT |
| Date: 02/14/2012 |
| Design Preparation: Sketches of basic idea of project |
| Basement Features: Bathroom(s) |
| Basement Features: Bedroom(s) |
| Basement Area Description: Partially Finished |
| Square Footage: More than 800 (large) |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: finish a bathroom (rough plumbed and framed) and a bedroom. |
|