| Project Name: Remodel a Kitchen |
| Project Location: Stillwater, OK |
| Date: 04/06/2012 |
| Floorplan: I am considering changes to kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: No - I do not plan to move or update the appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Lighting: Yes - I plan to update the lighting |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: properly install sliding door OR replace with new doors onto patio... update cabinets with new top, install laminate (?) flooring....I need to speak with a KNOWLEDGEABLE person with my ideas, wants, etc...... |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Stillwater, OK |
| Date: 03/09/2012 |
| Project Description: Build a new sunroom or enclosed patio or porch |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Closing on home in APril. One of the things that i wil eventually get around to doing. Going to be about a 10' deep 15' wide. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Stillwater, OK |
| Date: 03/06/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: existing footprint of upstairs master bath cannot be enlarged. needs to be modified for disability shower access and toilet access. need to discuss options. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Stillwater, OK |
| Date: 03/02/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Bethroom floor needs replaced, including underfloor structure, need new vanity with storage, major renovation but very small bathroom |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Stillwater, OK |
| Date: 02/27/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Looking to update my bathroom - Need new tile, replace tub/shower and also toilet |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Stillwater, OK |
| Date: 01/25/2012 |
| Floorplan: I am considering changes to kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: Yes - I plan to move or update some or all appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Lighting: Yes - I plan to update the lighting |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Small Kitchen broken up by walls for laundry and pantry. Want to bust down walls and hide laundry under counter, and move cabimets and counter to other side of space. Need new flooring,with some rebuild,and countertops with lots of storage. |
|
|
|
| Project Name: Build an Addition |
| Project Location: Stillwater, OK |
| Date: 01/17/2012 |
| Interested in Green Alternatives: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Build - Use existing architectural drawings |
| Property Owner: Yes |
| Comment: Frame in an modification to an existing structure. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Stillwater, OK |
| Date: 01/04/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Comment: bathroom connected to master with a tub & toilet "room" to the right double sinks in the center, a large cabinet to the left and an added on stand up shower at the far left. I would like to add a larger 2 person tub and re-do the shower. |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Stillwater, OK |
| Date: 12/02/2011 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 5 - 6 weeks |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Stillwater, OK |
| Date: 11/29/2011 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 5 - 6 weeks |
|