|
|
| Project Name: Remodel a Bathroom |
| Project Location: Silver Springs, NV |
| Date: 05/09/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Comment: 40 ft travel trailer. living in, but need to fix bathroom area. install new toilet, shower, plumbing. i am moving the walls where i want them as we speak. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Silver Springs, NV |
| Date: 02/23/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: bathroom remodel on mobile home, would prefer tankless water heater |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Silver Springs, NV |
| Date: 01/21/2012 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 9 - 12 weeks |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Silver Springs, NV |
| Date: 10/23/2011 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 9 - 12 weeks |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Silver Springs, NV |
| Date: 07/03/2011 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 5 - 6 weeks |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Silver Springs, NV |
| Date: 06/18/2011 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Need new shower surround, floor and door. Replace toilet with more modern one. BR floor is carpeted, would like something to go with the recently updated cultured marble counter tops. Garden tub needs some sort of color change. It is currently a white fiberglass. |
|
|
|
| Project Name: Build an Addition |
| Project Location: Silver Springs, NV |
| Date: 06/18/2011 |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Project Description: Design and build |
| Comment: wanted to add 2 more bedrooms by the south side of the house |
|
|
|
| Project Name: Build an Addition |
| Project Location: Silver Springs, NV |
| Date: 05/25/2011 |
| Interested in Green Alternatives: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Addition: Detached addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Build - Use existing architectural drawings |
| Rooms Included:: Deck/Porch |
| Property Owner: Yes |
| Comment: My home needs gutters so that water drains away from sidewalks, ECT. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Silver Springs, NV |
| Date: 01/25/2011 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 5 - 6 weeks |
|
|
|
| Project Name: Build an Addition |
| Project Location: Silver Springs, NV |
| Date: 04/08/2010 |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Project Description: Design and build |
| Comment: I need to contact the manufacturer of my manurfactured home to get authorization to modify the design of my current structure. Then I need plans drawn up. Then I need to get permits. Then I will go from there. |
|