|
|
| Project Name: Build an Addition - For Business |
| Project Location: Romeo, MI |
| Date: 10/18/2011 |
| Interested in Green Alternatives: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Addition: Remodel existing space |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Build - Use existing architectural drawings |
| Rooms Included:: Garage/Workshop |
| Property Owner: Yes |
| Comment: General contracotr for roof repairs aswell as adding a peace of equipment in warehouse. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Romeo, MI |
| Date: 07/17/2011 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: We would like to remove a fiberglas steam shower and whirlpool tub and just have a larger tiled shower. Replace the flooring and cabinets and sinks and install a higher toilet and replace sinks and facets. |
|
|
|
| Project Name: Install or Replace a Garage Door |
| Project Location: Romeo, MI |
| Date: 05/09/2011 |
| Type of garage door: Aluminum |
| Type of garage door: Steel |
| Need garage door opener?: Don't Know |
| Kind of Garage Door: RV garage door |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: pole barn roll up door needs to be enlarged from 9' to 11' |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Romeo, MI |
| Date: 04/07/2011 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Bank of windows, removal of wall and floor tile, removal of cabinets and mirrors, extending bathroom wall into adjoining room closet, free standing tub with shower, removal of door opening inside the bathroom |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Romeo, MI |
| Date: 02/05/2011 |
| Floorplan: I am considering changes to kitchen floorplan |
| Cabinets: No - I do not plan to move or update the cabinets |
| Appliances: No - I do not plan to move or update the appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Lighting: No - I do not plan to update the lighting |
| Interested in Green Alternatives: No |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: No |
|
|
|
| Project Name: Remodel or Renovate One or More Rooms |
| Project Location: Romeo, MI |
| Date: 02/04/2011 |
| Design Preparation: None |
| Rooms to be Remodeled: Bathroom |
| Expected Level of Quality: High End - I prefer the highest quality craftsmanship and materials |
| Remodel Featurings: Don't Know |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Home addition, a few bedrooms and baths. |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Romeo, MI |
| Date: 01/28/2011 |
| Floorplan: I am considering changes to kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: Yes - I plan to move or update some or all appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Lighting: Yes - I plan to update the lighting |
| Interested in Green Alternatives: Yes |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
|
|
|
| Project Name: Build an Addition |
| Project Location: Romeo, MI |
| Date: 11/29/2010 |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Second story addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Design and build |
| Rooms Included:: Bedroom(s) |
| Property Owner: Yes |
| Comment: small bungalow looking to finish attic, need stairs and possible dormers & new roof too. |
|
|
|
| Project Name: Build an Addition |
| Project Location: Romeo, MI |
| Date: 10/26/2010 |
| Design Preparation: None |
| Rooms for Addition: Porch |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Romeo, MI |
| Date: 10/12/2010 |
| Floorplan: I plan to maintain existing kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: Yes - I plan to move or update some or all appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Lighting: Yes - I plan to update the lighting |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Kitchen cabinets to be installed by cabinet maker, need range ventilation to outside installed, sink drain pipe to be moved, electrical for wall ovens, plugs, recessed lighting etc. |
|