|
|
| Project Name: Remodel a Basement |
| Project Location: Rigby, ID |
| Date: 02/22/2012 |
| Basement Area Description: Unfinished |
| Square Footage: 400 - 800 (medium) |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: needing an est on having basement re-modeled.. |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Rigby, ID |
| Date: 07/01/2011 |
| Project Description: Build a new sunroom or enclosed patio or porch |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Comment: It has a concret floor, one back side is the house, I need three sides, measurenet are 11 fwwt wides 29 feedt long |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Rigby, ID |
| Date: 05/17/2011 |
| Project Description: Build a new sunroom or enclosed patio or porch |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Would need to be 12 foot wide where it attached to the house, but can be as long as desired 16 to 20' would work well. It is 3'high to the <br />exit of the house which is a sliding glass door. The concrete slab will be installed by us first and the steps as well. It is approximately 11' from grade to roofline. The house has vinyl siding. Must be able to withstand Idaho winds and winters. |
|
|
|
| Project Name: Build an Addition |
| Project Location: Rigby, ID |
| Date: 05/15/2011 |
| Consumer Owns Home: Yes |
| Desired Completion Date: Less than 2 months |
|
|
|
| Project Name: Build an Addition |
| Project Location: Rigby, ID |
| Date: 03/24/2011 |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Design and build |
| Rooms Included:: Deck/Porch |
| Rooms Included:: Living/Family room |
| Rooms Included:: Common area(s) |
| Property Owner: Yes |
| Comment: I wish to enlarge my living and dining rooms by building out |
|
|
|
| Project Name: Remodel a Basement |
| Project Location: Rigby, ID |
| Date: 01/27/2011 |
| Design Preparation: Sketches of basic idea of project |
| Basement Features: Bathroom(s) |
| Basement Area Description: Partially Finished |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: basement is framed currently, ready for bathroom to be installed, second part would be to paint and finish rest of basement |
|
|
|
| Project Name: Install, Repair or Replace Plumbing or Fixtures |
| Project Location: Rigby, ID |
| Date: 09/15/2010 |
| Project Description: Install a new plumbing item |
| What kind of location is this?: Home/Residence |
| After Business Hours: No |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: replace sink in bathroom |
|
|
|
| Project Name: Add a Sunroom or Patio Enclosure |
| Project Location: Rigby, ID |
| Date: 05/06/2010 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 1 - 2 months |
|
|
|
| Project Name: Build an Addition |
| Project Location: Rigby, ID |
| Date: 04/08/2010 |
| Consumer Owns Home: Yes |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Design and build |
| Rooms Included:: Bathroom |
| Rooms Included:: Bedroom(s) |
| Comment: room addition near an existing septic tank [11ft.] |
|
|
|
| Project Name: Remodel a Basement |
| Project Location: Rigby, ID |
| Date: 03/23/2010 |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Comment: we need windows added to the basement and there is water getting in the basement |
|