|
|
| Project Name: Remodel a Bathroom |
| Project Location: Poynette, WI |
| Date: 02/19/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
|
|
|
| Project Name: Renovate or Repair a Home |
| Project Location: Poynette, WI |
| Date: 02/10/2012 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Project Description: Several small projects of varying nature |
| Comment: I am looking to hire someone to come out and do drywall. This is drywall repair. |
|
|
|
| Project Name: Install or Replace a Shower |
| Project Location: Poynette, WI |
| Date: 01/27/2012 |
| Type of shower install: Free-standing shower |
| Shower: Replace or move existing shower |
| Plumbing fixtures: Yes - I plan to install new plumbing fixtures |
| Tile: No - I do not plan to install new tile |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Part of larger remodel: No |
| Property Owner: Yes |
| Comment: Remove tub and install walk-in shower |
|
|
|
| Project Name: Build an Addition |
| Project Location: Poynette, WI |
| Date: 04/02/2011 |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Addition: Ground level addition |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Project Description: Design and build |
| Rooms Included:: Living/Family room |
| Property Owner: Yes |
| Comment: want an addition or great room |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Poynette, WI |
| Date: 03/20/2011 |
| Shower / Bath: No - I will keep the existing shower or bath as is |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: I need to have soil pipe replaced from basement to toilet washer sinnk dishwasher walls r open now basement ceiling open |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Poynette, WI |
| Date: 03/20/2011 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: Yes - I will be replacing or moving the toilet |
| Cabinets / Vanity: Yes - I plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Need to make the master bath handicap accessible with handicapped features, especially the toilet and shower. I ONLY WANT EMAILS. NO PHONE CALLS |
|
|
|
| Project Name: Remodel a Kitchen |
| Project Location: Poynette, WI |
| Date: 02/16/2011 |
| Floorplan: I am considering changes to kitchen floorplan |
| Cabinets: Yes - I plan to move or update the cabinets |
| Appliances: Yes - I plan to move or update some or all appliances |
| Countertops: Yes - I plan to update the countertops |
| Sinks: Yes - I plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Lighting: Yes - I plan to update the lighting |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: pull out wall and do a overhaul on the hole house. |
|
|
|
| Project Name: Remodel or Renovate One or More Rooms |
| Project Location: Poynette, WI |
| Date: 09/24/2010 |
| Design Preparation: Sketches and/or basic idea of project |
| Rooms to be Remodeled: Bathroom |
| Rooms to be Remodeled: Bedroom |
| Rooms to be Remodeled: Family room |
| Rooms to be Remodeled: Other |
| Expected Level of Quality: Good - I want a balance between quality and price |
| Remodel Featurings: Electrical |
| Remodel Featurings: Flooring and/or Carpet |
| Remodel Featurings: Heating / Air / Ventilation |
| Remodel Featurings: Plumbing |
| Remodel Featurings: Walls and/or Ceilings |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: No structural changes. Mostly repair & refurbishing of existing surfaces (floors, walls & ceilings), with a small amount of plumbing & electrical required. |
|
|
|
| Project Name: Remodel a Bathroom |
| Project Location: Poynette, WI |
| Date: 09/13/2010 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: Yes - I plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: Yes - I plan to update the flooring |
| Extensiveness of Remodel: I am considering changes to bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Want to remove over sized tub, replace it with a smaller jetted tub and increase shower space. |
|
|
|
| Project Name: Remodel or Renovate One or More Rooms |
| Project Location: Poynette, WI |
| Date: 08/10/2010 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Comment: I need to have renovation done for dining room and kitchen area |
|